category: literaturenote citekey: riversonruralroadssubsaharan title: Rural Roads in Sub-Saharan Africa authors: "Riverson, John; Gaviria, Juan; Thriscutt, Sydney" zotero_key: TFGAURGM zotero_storage: 7VGXZUQ6 collections: imporditud folder: 001_artiklid firstAuthor: "Riverson, John"
John Riverson, Juan Gaviria, and Sydney Thriscutt
The gravity of rural transport bottlenecks across Sub-Saharan Africa has been underscored by the Bank's Long Term Perspectives Study (LTPS). Recent experience indicates that the potential benefits of structural adjustment operations are reduced because of inadequate rural transport capacity. The effectiveness and sustainability of past programs for rural roads have been hampered by the lack of a coherent policy framework and institutional focus for planning, funding and maintenance.
The report, prepared under the Rural Travel and Transport Project of the Sub-Saharan Africa Transport Program (SSATP), presents findings from a review of 127 projects with rural road components in SSA. The review highlights key policy changes discussed under the main headings of planning, design and technology, resource mobilization, and sectoral organization and institutional performance.
The report stressed the urgent necessity to develop a coherent Rural Road strategy and support for institutional capabilities in each country. Planning is seen as a process involving key constituencies at various levels rather than a methodology. Prevailing financial constraints and low traffic volumes suggest that the majority of SSA rural roads should be designed to provide essential access, emphasizing spot surface improvements better drainage.
Labor-based methods should be systematically promoted for construction, rehabilitation and maintenance of rural roads where conditions are appropriate. Close cooperation with ILO, and transfer of technology among SSA countries will be increasingly needed for further actions. The Bank should prepare clear guidelines to assess labor-based operations paying particular attention to maximizing employment of women on such operations.
Providing financial and institutional capabilities for long term rural road maintenance had proven difficult. The report stresses the need to eventually involve local funding administered by local organizations, with technical advice from central authority. However, competition for resources is fierce at the local level, and investigation is necessary to evolve suitable methods for rural road maintenance, funded and administered by local organizations.
Finally, institutional problems were found to predominate in rural road projects, but improvement has been slow. Although setups should accommodate local conditions, the moist effective institutional arrangement is likely to be through a small-centralized agency which can act as a focus for policies, planning and funding for rural roads. Operations should then be undertaken through local organizations responsible for maintenance.
This paper has been prepared as part of the Rural Travel and Transport Project of the Sub-Saharan Africa Transport Program (SSATP). It combines the results of a separate review of individual Bank projects, and results of the joint SSATP and MADIA studies of rural roads and agricultural performance in Cameroon, Kenya, Malawi, Nigeria, Senegal, and Tanzania. Financial support was provided by the Swiss Development Corporation (SDC), NORAD, Swedish International Development Agency (SIDA), and the World Bank. The report was prepared by John Riverson (Task Manager), Juan Gaviria, and Sydney Thriscutt, consultant, under the direction of Jean Doyen, Chief, Infrastructure Division of the Africa Technical Department (AFTIN). The authors analyzed information from World Bank appraisal and other reports, and information and comments obtained during discussions and meetings with many World Bank staff and members of the International Coordinating Committee (ICC). Special mention is made of Messrs. Paul Peter of SDC, Tore Gjos of NORAD, Per Persson of SIDA, G. Metschies of GTZ, Geoff Edmonds and Sven Hertel of ILO, M. Marumo of ADB, and M. E. Dhliwayo of ECA, members of the ICC who discussed the final results and policy recommendations. The paper also benefited from detailed internal review and comments by B. Chatelin, P. Morris, A. Faiz, S. Carapetis, A. Nickesen, U. Lele, T. Pankaj, B. Mitchell, and H. Walters. S. Halgrimsson and P. Gyamfi provided information on the Abidjan Feeder Roads Unit. Written or verbal comments were received from C. Cook, A. Galenson, H. Beenhakker, J. Peberdy, A. Pellegrini, J. Brown, and R. Burns, Prof. A. Mabogunje of DFRRI, Nigeria, Dr. K. C. Kaira, University of Dar-es-Salaam, Tanzania, J. Karuiru, Roads Department, Ministry of Public Works, and G. Taylor, SDC, Nairobi, Kenya. The authors benefited from final comments made during a seminar attended by managers of Infrastructure and Agriculture divisions chaired by F.S. O'Brien, Chief Economist of the Bank's Africa Region. V. Herron, K. Waters-Reed and M. Verbeeck assisted in final word processing for publication.
The importance of rural roads and transport in agricultural development has been recognized in the past, and has also been recently underscored by the Bank's Long Term Perspectives Study of Sub-Saharan Africa. Despite Bank's long experience in financing rural road projects, the effectiveness and sustainability of past programs for rural roads have been hampered by the lack of a coherent framework and institutional focus for planning, funding and maintenance. Research and policy analysis are needed to understand the transport needs of rural households and to devise effective ways to develop and promote rural transport services in rural areas.
One of the objectives of the Rural Travel and Transport Project of the Sub-Saharan Africa Transport Program (SSATP) is to develop and disseminate improved policies to plan, finance, build and maintain rural roads. A review conducted under this project has refocused attention on relevant policy issues analyzed from 127 Bank rural road projects in Africa over the past 25 years. The findings of this review were discussed at a Bank's Africa Regional Management Seminar in April 1990.
The findings of the work to date shows that African governments must develop rural roads strategy which are closely tied to other highway, rural and agricultural development strategies. The Bank is assisting some governments in this regard through operational projects in Ghana, Madagascar, Nigeria, Uganda, and Ethiopia. The strategies require on the part of governments, the Bank, and other bilateral donors, long-term commitment, as well as continuity for developing the policy framework and institutional capabilities for rural roads planning, improvement and maintenance. With the prevailing financial constraints, spot surface improvements and improved drainage must be emphasized rather than increased road widths. It is also essential to systematically promote the development of capacity for labor-based methods in each country. This could be done through pilot programs in close cooperation with ILO, making use of horizontal transfer of know-how, with cross-fertilization among SSA countries. Lastly, policy development for rural roads will only be complete after policy actions needed to improve rural transport services are also more clearly defined as part of the ongoing program of studies.
This document is the first of a series by the Infrastructure Division of Africa Technical Department and the SSATP addressing policy issues related to the management, rehabilitation and maintenance of rural road infrastructure in Sub-Saharan Africa. The present findings should provide the basis for follow up work to develop rural road strategies to support the needs of agriculture and other sectors in each country.
Ismael Serageldin Director, Technical Department Africa Region
ADP Agricultural Development Project
ADT Average Daily Traffic
AGR Refers to rural road projects appraised by agricultural divisions
CMB Ghana Cocoa Marketing Board
COMWORKS Ministry of Communications and Works in Tanzania
DDC District Development Committee in Kenya
DFR Department of Feeder Roads in Ghana
DFRRI Federal Directorate of Food, Roads and Rural Infrastructure in Nigeria
DH Directorate of Highways (e.g. Cameroon) DNGR Direction Générale du Génie Rural
DRIMP District Road Improvement Program in Malawi EPD Economic Planning Department in Malawi ESAMI Eastern and Southern African Management Institute ETCA Ethiopian Transport Construction Authority FACU Federal Agricultural Coordinating Unit
FCFA Franc CFA
FNCV Fondo Nacional de Caminos Vecinales in Colombia
GHA Ghana Highway Authority HDM Highway Design Model ILO International Labour Office IMT Intermediate Means of Transport
IRR Internal Rate of Return km2 Square kilometer
LGA Local government authority in Nigeria LTPS Long Term Perspective Study
MADIA Managing Agricultural Development in Africa - Bank research project
MINPAT Ministry of Planning and Territory in Cameroon MLG Ministry of Local Government in Malawi
MOTC Ministry of Transport and Communications in Kenya
MRP Minor Roads Program in Kenya
MSADPs Multistate ADPs in Nigeria
MWS Ministry of Works and Supplies in Malawi
ONCPB Office National Céréalière et des Produits de Base in Cameroon
PCR Project Completion Report
Period I 1964-1979 Period II 1980-1989
PPAR Project Performance Audit Report RARP Rural Access Road Program in Kenya RMI Road Maintenance Initiative of SSATP RRO Rural Roads Organization in Ethiopia RTTP Rural Travel and Transport Project
SAR Staff Appraisal Report
SNPR Togo's National Feeder Roads Service (Service National des Pistes Rurales)
SODECAO Société de Développement du Cacao SODECOTON Société de Developpement du Coton
SODEFITEX Société pour le Développement des Fibres Textiles SOTOCO Société Togolaise du Coton (Cotton Development Agency)
SRDR Benin Service des Routes de Desserte Rurale
SSA Sub-Saharan Africa
SSATP Sub-Saharan Africa Transport Program TPU Transport Planning Unit of MWS in Malawi TRP Transportation appraised rural road projects UNDP United Nations Development Program
Veh-Km Vehicle-Kilometer
VOC Vehicle Operating Costs vpd Traffic in vehicles per day
| EXECUTIVE SUMMARY | 7 |
|---|---|
| PLANNING | 7 |
| DESIGN AND TECHNOLOGY | 8 |
| RESOURCE MOBILIZATION | 9 |
| SECTORAL ORGANIZATION AND INSTITUTIONAL PERFORMANCE | 9 |
| TRANSPORT SERVICES | 10 |
| COUNTRY LEVEL ACTION PLANS | 10 |
| OPERATIONAL APPROACH FOR THE WORLD BANK | 10 |
| FURTHER STUDIES, RESEARCH AND DISSEMINATION | 11 |
| 1. INTRODUCTION |
1 |
| II. RURAL ROADS IN SUB-SAHARAN AFRICA | 4 |
| III. REVIEW OF BANK EXPERIENCE |
6 |
| IV. PLANNING | 10 |
| TRENDS AND LESSONS TO BE LEARNED IN PLANNING | 12 |
| V. DESIGN AND TECHNOLOGY | 15 |
| GEOMETRIC STANDARDS | 15 |
| DESIGN AND CONSTRUCTION OF DRAINAGE STRUCTURES | 16 |
| ENVIRONMENTAL CONSIDERATIONS IN RURAL ROAD DESIGN | 17 |
| CHOICE OF WORK METHODS FOR CONSTRUCTION AND MAINTENANCE | 18 |
| USE OF MECHANICAL EQUIPMENT | 20 |
| THE ROLE OF WOMEN AND LABOR-BASED METHODS | 23 |
| TRENDS AND LESSONS TO BE LEARNED IN DESIGN AND TECHNOLOGY | 24 |
| VI. RESOURCE MOBILIZATION |
25 |
| FINANCIAL RESOURCE MOBILIZATION | 25 |
| HUMAN RESOURCE MOBILIZATION | 28 |
| TRENDS AND LESSONS TO BE LEARNED IN RESOURCE MOBILIZATION | 28 |
| VII. SECTORAL ORGANIZATION AND INSTITUTIONAL PERFORMANCE | 30 |
| RURAL ROAD UNITS WITHIN CENTRAL ROADS AUTHORITIES | 30 |
| SPECIAL PROJECT UNITS AND PARASTATALS | 31 |
| LOCAL INSTITUTIONS AND COMMUNITIES | 31 |
| TRENDS AND LESSONS TO BE LEARNED IN INSTITUTIONAL PERFORMANCE | 32 |
| VIII. BANK PROJECT MANAGEMENT | 33 |
| THE REGIONAL FEEDER ROADS UNIT IN ABIDJAN | 33 |
| LESSONS TO BE LEARNED FROM BANK PROJECT MANAGEMENT | 34 |
| IX. POLICY RECOMMENDATIONS | 35 |
| RECOMMENDATIONS FOR COUNTRY POLICIES | 35 |
| COUNTRY LEVEL ACTION PLANS | 36 |
| RECOMMENDATIONS FOR BANK OPERATIONS | 36 |
| FURTHER STUDIES, RESEARCH AND DISSEMINATION. |
37 |
contractors is necessary. Specific measures to facilitate their development and to improve their operation should be part of rural road projects. The experience gained under ongoing rural road projects in Ghana which include training of domestic contractors in the use of labor-based methods should be useful in designing similar programs.
Overall, the most effective institutional arrangement is likely to involve a small centralized agency acting as a focal point for policies, overall planning and funding and overseeing regional community organizations responsible for local planning and operations. The latter should be able to raise their own funds, but would receive technical advice and matching funds from the central agency.
2/ The World Bank, 1989, "Sub-Saharan Africa, From Crisis to Sustainable Growth".
3/ See Gaviria, J., 1990, "A Regional Analysis of Institutional and Financial Constraints to Rural Transport: The Case of Tanzania", SSATP/MADIA Discussion Paper.
4 Rural roads in this paper are public roads functionally classified below Primary, Trunk or Secondary roads in most countries. They include roads often described as rural access, feeder, agricultural, irrigation forestry or unclassified roads. They may include Tertiary roads if these are functionally grouped as Rural Roads as here defined.
5/ C. Carnemark, J. Biderman, D. Bovet, 1976, "The Economic Analysis of Rural Road Projects." World Bank Staff Working Paper No. 241.
In addition, the International Labor Organization (ILO) has produced a series of reports on rural road operations, mainly concerned with labor intensive work. Finally, "Rural Transport Services" by Beenhakker, Carapetis, Crowther and Hertel (I.T. Publications, 1987) provides a complete and practical guide to planning and implementation. All the above work provide good basis for supporting rural road and transport policies. However, in an effort to foster a common policy, the present review has been carried out to assess experience in rural road lending, and to identify the lessons and policy implications for SSA governments, the Bank and other donors. It is based on: (i) an assessment of the Bank experience in rural road lending in SSA with a view to draw lessons concerning policies; and (ii) reviews of rural roads and transport and their linkages with agriculture in six MADIA countries (Cameroon, Kenya, Malawi, Nigeria, Senegal and Tanzania). The intention is to identify key issues, suggest rural transport policy changes, and to establish the need for research or specific case studies.
Washington, D.C.: World Bank.
H.L. Beenhakker and A.M. Lago, 1983, "Economic Appraisal of Rural Roads: Simplified Operational Procedures for Screening and Appraisal." World Bank Staff Working Paper No 610. Washington, D.C. World Bank.
S. Carapetis, H.L. Beenhakker, J.D.F. Howe, 1984, "The Supply and Quality of Rural Transport Services in Developing Countries." World Bank Staff Working Paper No 654. Washington, D.C.: World Bank.
C. Cook, H.L. Beenhakker, R. Hartwig, 1985, "Institutional Considerations in Rural Road Projects." World Bank Staff Working Paper No 748. Washington, D.C.: World Bank.
6/ Riverson, J. and S. Carapetis, 1990, "Potential Role of Intermediate Means of Transport in Rural Travel and Transport in Sub-Saharan Africa", AFTIN Working Paper, World Bank, Washington, D.C.
raising the capability of off-road transport could result in much higher returns to rural roads investments;
Such promotional activities could effectively apply the Training and Visit approach used in agricultural extension. The above reviews have pointed out the need for a better understanding of the nature of rural travel and transport and its impact on rural development which is being addressed under SSATP. The rest of the review presented in this paper, however, focuses on the experiences with rural road projects in SSA.
1.06 After a description of the rural road network in SSA and an outline of the results of the project review, this paper points out experience and the lessons to be learned from Bank experience under the main headings of planning, design and technology, resource mobilization and institutions. Given the short life span of rural roads, the lack of maintenance is the central problem affecting the sustainability of past investments and the pace of future development. Earth roads only last a few years. Except for structures, the activities and skills involved in maintenance of earth road is the same as those involved in improvement and rehabilitation. The position taken in the present paper is that maintenance of rural road in SSA has to be integrated at all stages of planning, resource mobilization, and selection of technology. Therefore, maintenance is not treated separately but rather as an integral part of every issue analyzed. The paper outlines the emerging policy options for governments and reviews the implications for the Bank operational approach. Finally it suggests areas for further research and study.
2.01 There are approximately 700,000 kilometers of rural roads out of a total of over 1.02 million kilometers of road in SSA (Table 2.1), with concentrations in a few countries. Three countries (Nigeria, Cameroon and Côte d'Ivoire) have more than half the rural roads in West Africa, while Zaire, Zimbabwe, Madagascar and Tanzania account for more than two thirds of East African rural roads. The density of rural roads is low compared with other parts of the world. Nigeria has about 90 meters of rural road per square kilometer, but an acceptable 'target' density, based on Indian experience in areas with similar population densities to those in Nigeria, would be about 730 meters. Density also varies widely within countries. In Kenya, highly populated provinces with abundant natural resources have 400 to 500 meters per square kilometer, falling to less than 30 meters in non productive areas. Sparse populations and low agricultural productivity mean that the burden of providing and maintaining an adequate rural road network falls more heavily on SSA populations than it does, for example, on the heavily populated and productive countries of Southeast Asia. Whereas road lengths per head of population are high, they are still low per unit of area.
| | Table 2.1. Kilometers of Roads by Type and Region | | | | | | | | | |
|---------------------------------------------------------|---------------------------------------------------|-------------|--------------------|--|--|--|--|--|--|--|
| Region | All Roads | Rural Roads | Density
(m/km2) | | | | | | | |
| Western Africa | 430,937 | 286,425 | 32 | | | | | | | |
| Eastern and
Southern Africa | 589,943 | 398,972 | 36 | | | | | | | |
| Total | 1,020,880 | 685,397 | 34 | | | | | | | |
| Source: Various Bank Appraisal Reports and Country Data | | | | | | | | | | |
2.02 The funding needs to rehabilitate rural roads in SSA are enormous, and a range of estimates has been made. The highest estimate (see paragraph 1.02) calls for US\$2.5 billion per year for a ten-fold increase in the rural road network. On the other hand, a 1988 Bank study 7/ estimated that US\$350 million per year are required considering that half of the rural road network in SSA (350,000 km) requires substantial rehabilitation. 8/ In addition to the latter, annual outlays of US\$400 million for maintenance and US\$20 million for institutional building would be needed to keep up the present
7/ Harral, C., 1988, "Road Deterioration in Developing Countries" World Bank Policy Study, Washington, D.C..
8/ Completed Bank projects have so far constructed or rehabilitated some 89,000 km and enhanced maintenance over a further 75,000 km of the network (Table 3.1).
network. The total annual requirements of US\$770 million would amount to about 0.5 per cent of the region's GNP. 9/ For agricultural production to rise, the rural road network would need to be extended commensurate at least with the expected rate of growth of marketed agriculture and use of modern inputs. 10/ The need for network expansion can therefore be estimated on an average annual growth of 3 percent, for a total annual outlay of about US\$920 million a year or 0.6 percent of regional GNP.
9/ This amounts to one-fifth of the 2.5 percent of GNP reported to be required by the overall road sector ("Road Deterioration in SSA", paper presented at SSATP Road Maintenance Policy Seminars, 1989). The region's GNP is reported as US\$149 billion in 1987 (World Bank, 1989, "World Development Report").
10/ Further expansion of the network will be justified given the need to increase the marketed surplus as a share of the total agricultural growth, to support fast growing urban populations.
3.01 The present review has taken into consideration 127 rural road projects carried out since 1964 (Annex 1). 11/ Summaries of each project were made from SARs, PCRs, PPARs and supervision reports. These summaries include basic project information, data on road selection methodology, responsibility for road design, supervision, construction and maintenance, whether labor or equipment based methods were used, and a subjective rating on how adequately technical assistance, maintenance funding and maintenance institutions were handled in the project. 12/
3.02 For comparison, projects were divided between two periods:
Period I : 1964 through 1979 (79 projects) Period II: 1980 through 1989 (43 projects)
| (Actual) | No. of Projects |
Ln/Cr. Amount |
Project Cost |
Constructed or Rural RoadRehabilitate ComponentTargets (Actual)Targets |
Maintained | |
|---|---|---|---|---|---|---|
| (million of dollars in 1988 prices) | (Kilometers of Roads) | |||||
| Period I (1964-79) | ||||||
| Transportation Divisions | 40 | 1,558.4 | 3,942.7 | 611.3 | 30,115 (73.4%) | 27,319 (41.7%) |
| Other | 39 | 1,301.7 | 2,124.8 | 276.0 | 19,884 (92.5%) | 1,659 (46.3%) |
| Period II (1979-89) | ||||||
| Transportation Divisions | 15 | 703.2 | 1,715.4 | 247.5 | 15,057 (88.6%) | 15,983 (53.1%) |
| Other This review is reported fully in a January 1990 AFTIN working paper. |
28 | 1,704.6 | 4,097.0 | 615.8 | 24,055 (62.0%) | 30,210 (n.a.) |
| Both Periods | ||||||
| Transport. Divisions differences over time and between transportation and other appraised projects are significant. |
55 | 2,261.6 | 5,658.1 | 858.8 | 45,172 (77.0%) | With the large number of projects involved, some statistical analysis is valid, and Chi-squared tests were done to assess whether 43,302 (42.6%) |
| Other | 67 | 3,006.3 | 6,221.8 | 891.8 | 49,939 (81.6%) | 31,689 (46.3%) |
| TOTAL | 122 | 5,267.9 | 11,879.9 | 1,750.6 | 89,111 (79.2%) | 75,171 (42.7%) |
The division corresponds approximately to the time when an emphasis on structural adjustment was introduced. A summary of projects reviewed is shown in Table 3.1, with details in Annex 2. Five projects which had not been approved by the Bank at the time of the review are not included in these tables, but their features are reviewed since they represent emerging trends in the Bank's approach. Costs were taken from PCRs or PPARs where possible, but otherwise, SAR estimates were used. Road lengths achievement in Table 3.1 were calculated with data from the 66 completed projects reported in the PCRs and PPARs (Annex 1).
3.03 The 127 projects reviewed comprised at appraisal 164,000 km of rural road to be constructed, rehabilitated or maintained. The total rural road components amounted to US\$1,750 million (1988 costs), 13/ US\$990 million in IBRD loans and US\$760 million in IDA credits. Peak lending occurred in the early 1980's, largely as a result of Nigeria's agricultural development projects (Figure 3.1). Projects took place in 28 countries, with two thirds in Western Africa, and four countries (Nigeria, Ethiopia, Kenya and Côte d'Ivoire) accounted for 64% of the total cost, Nigeria taking 35%. 24 countries shared the remainder. Cumulative total for each country are in Annex 3.
Figure 3.1: World Bank Rural Roads Lending in SSA IBRD and IDA
13/ The 1988 costs were determined using the GNP deflator from UNDP/World Bank, "African Economic and Financial Data", Washington, D.C.: 1989.
Details of the frequency of these problems are shown in Table 3.2. Some projects suffered significantly from more than one type of problem. Overall, the incidence of major problems in projects was lower after 1980, which indicates that later projects benefited from the experience gained. There are also cases where similar problems show up in a series of projects in one country or region, indicating either insufficient consideration of past experience in planning new projects or intractable problems requiring a radical reappraisal of project suitability.
Table 3.2. Identification of Major Implementation Problems
| 1964-1979 | 1980-1989 | 1964-1989 | |||||
|---|---|---|---|---|---|---|---|
| Type of Problem | (i) | (ii) | (i) | (ii) | (i) | (ii) | Total |
| Inadequate Planning | 26 | 27 | 0 | 7 | 15 | 22 | 26 |
| Resource Constraints | 50 | 24 | 11 | 7 | 33 | 20 | 27 |
| Institutional | 47 | 34 | 36 | 20 | 42 | 30 | 37 |
| Technical | 26 | 10 | 7 | 0 | 18 | 7 | 13 |
| Other Minor | 8 | 15 | 36 | 33 | 20 | 20 | 20 |
| None Identified | 3 | 5 | 18 | 13 | 9 | 7 | 8 |
| No. of Projects | 39 | 40 | 28 | 15 | 67 | 55 | 122 |
Note: Some projects were significantly affected by more than one type of problem.
Source: Various Bank Appraisal Reports and Country Data
3.06 Institutional problems were by far the most common, affecting 35 per cent of projects. Only one third were rated in the review as having an acceptable level of institutional preparation and performance. Poor planning and resource constraints each affected about a quarter of projects, while technical problems occurred in about one project in eight. Bank work in rural roads has lacked a firm policy foundation and a long-term institutional perspective. Most projects have been done as add-on to highway projects or integrated agricultural operations except for the series of self-standing projects prepared by the feeder roads unit established within the Resident Mission in West Africa in Abidjan over the period of 1978-82. Trend of recent projects is to recognize the importance of the policy framework and institutional issues. In most countries, however, the policy framework and institutional arrangements needed to support expanded efforts to build and maintain rural roads has yet to be developed. The emerging lessons of positive experience in selected countries, Kenya, Malawi, Côte d'Ivoire, Ghana will be helpful in this task.
| Lengths % of Total |
Veh-Kms % of Total |
Expenditures as percent of |
total for roads | as percent of | Expenditures total national budget |
|
|---|---|---|---|---|---|---|
| Main | Rural | Main | Rural | |||
| Malawi | 53 | NA | 85 | 15 | 5.0 | 1.0 |
| Kenya | 52 | 13 | 69 | 31 | 3.4 | 2.4 |
| Tanzania | 32 | NA | 88 | 12 | 5.0 | 1.0 |
| Nigeria | 58 | 12 | 78 | 22 | 3.2 | 1.0 |
| Cameroon | 35 | 10 | 90 | 10 | 8.7 | 0.9 |
| Senegal | 39 | 10 | 93 | 7 | 2.9 | 0.4 |
Source: Gaviria, J., 1990, "Linkages Between Agricultural Performance and Rural Transport in Africa", World Bank.
4.03 There are no firm guidelines presently available for splitting expenditures between new construction, rehabilitation and maintenance for rural roads cannot, as yet, be analyzed as it can for main roads. A recent review of main roads in SSA, 14/ concluded that in a stable main road network, 65 per cent of expenditure should be for maintenance, 15 per cent for rehabilitation, and no more than 20 per
14/ "Road Deterioration in Sub-Saharan Africa": Paper presented at World Bank Road Maintenance Policy Seminars in Africa, 1989.
cent for new construction and improvement. Planning and funding for maintenance has generally been neglected or handled separately from construction. A consolidated planning and budgeting framework is called for, given the short life span of rural roads (i.e., 3 to 5 years) and the fact that tasks and skills involved in maintenance of earth roads are basically the same as those needed for their construction and rehabilitation.
4.04 Most projects reviewed specify a means of route evaluation and selection, using either vehicle operating cost savings, producer surplus or both (Table 4.2). However, a high of 40 per cent did not specify any particular method. It must be said that in practice, the validity of rural route selection using economic parameters is open to question. Using vehicle operating costs where the majority of traffic is non-motorized and where low-volume traffic estimates are inaccurate is obviously problematic. Similarly, producer surplus methods relying on the same supply response coefficients for different regions, and on spotty production data, will give uncertain results. In addition, prospects for rural road maintenance have not been correctly assessed, so that assumptions on useful road life have been too optimistic, and the full benefit stream has not developed as predicted.
| Table 4.2 Road Selection and Evaluation Criteria | | | | | | | | | | |--------------------------------------------------|-----|----------|-----|-----------|-------|-----|--|--|--| | | | Pre-1980 | | 1980-1989 | TOTAL | | | | | | | AGR | TRP | AGR | TRP | AGR | TRP | | | | | Producer Surplus (PS) | 9 | 6 | 8 | 2 | 17 | 8 | | | | | VOC Savings | 1 | 10 | 1 | 6(1) | 2 | 16 | | | | | VOC + PS | 5 | 2(1) | 3 | 2 | 8 | | | | | | Other Criteria | 11 | 4 | 3 | 1 | 14 | 5 | | | | | Not Specified | 18 | 15 | 14 | 4 | 32 | 19 | | | |
(1) represent projects not yet approved by the Board (as of 11/15/89)
Note: Combinations of the above criteria were applied in some projects.
Source: Various Bank Appraisal Reports and Country Data
costs. For rural roads, priorities were assessed using economic criteria plus social factors and engineering judgement. Although not rigorous, the system does produce a practical means of planning within the roads sub-sector. It would be desirable to develop similar methods elsewhere in SSA as an aid to sectoral planning.
4.07 The planning processes introduced in Kenya RARP (Box 4.1) and Malawi DRIMP used a combination of economic and social criteria. They succeeded because they were clearly defined and understood at project preparation stage, they were broadly accepted by the Government, and they used existing District level planning capacity, working in Kenya through District Development Committees. The Bank's involvement in the early stages of RARP and now in DRIMP has indicated that the development of local planning capacity takes place over a succession of projects, and not within the three to five years period of a single project.
factors, and more information is needed to assess which factors to include and the weight to be given to each. While the methodology should be well established, it is more important to put in place the procedures and processes for rural road planning, following agreed policies.
4.12 The Bank's present portfolio includes the development of rural road planning strategies in two countries. First, Nigeria's overall roads strategy considers some of the institutional aspects related to rural road planning. Second, Ghana is preparing with Bank assistance, a rural road strategy as part of the proposed National Feeder Roads Program. It includes a district priority system to guide future road planning in coordination with recently developed agricultural strategies, and road selection will be done by local representatives. The experience with the development of sectoral and regional planning in the Rural Access Road Program in Kenya (RARP,) in DRIMP, and elsewhere in Colombia and Thailand's ARD program, have been positive in guiding investments and securing the prospects for sustainability of rural road programs. Without a clear strategy feeder road programs may lead to higher investments in areas of relatively low agricultural potential or low population densities. 15/
15/ Nigeria's ADPs concentrated investment in the Northern States, which are not those with the highest potential. In Cameroon, most investment has been in areas of high value crops, where government has been most active and parastatals are strong. In Senegal, major investment took place in cash crop areas which government saw as high priority.
The relatively successful planning of Kenya's Rural Access Road Program offers important lessons. The road selection process before 1980 was started by each District Development Committee (DDC) which selected between 150 and 200 kilometers of roads for improvement, following a set of criteria set by the Rural Roads Branch of the Ministry. The preliminary selection was given to the Ministry of Transport and Communications (MOTC) in Nairobi where an internal rate of return (IRR) was calculated for the road package submitted by each district. If approved, the package and plans were then submitted to the funding agencies and the construction units. Three main problems affected the outcome of the selection process: (1) lack of reliable agricultural production data which led to fabrication of data and consequently to overestimation of supply response, (2) livestock production changes were unaccounted for, and (3) IRR analysis in Nairobi was made for each group of roads as a whole and included roads which otherwise would not have been justified in economic and rural access terms (note that this type of analysis with groups of roads is different from the regional prioritization advocated at the regional planning level). However, the inclusion of the DDC as a planning body has had an important spin-off creating planning capacity at the district level. After 1980 the RARP in Kenya reformulated the road selection process based on an analysis of the evaluation data which suggested that the main determinants of feasibility were the size of the impact area and the population served. The selection process was to be performed by a district field engineer from MOTC, with help from the District Development and Agricultural Officers. In this way it was guaranteed that the selection process would include adequate knowledge of local conditions. The changes introduced demonstrated that flexibility in the program added to its strength.
The criteria used for the successful Rural Access Road program in Kenya included: road length (e.g. 5-10 kilometers), present state (e.g. non-motorable), type and state of connecting roads, degree of connection to markets and social services, density of population and small farmer holdings, degree to which cultivated area could be expanded in road impact area, number of related development programs in the impact area, availability of appropriately priced labor for road construction, degree to which development constraints would hinder road impacts, cost of road and technical feasibility The revised road selection process de-emphasized the production oriented approach and expanded the criteria to include social and political variables. Such changes were not widely supported, even though the "Government, with the tacit support from some of the donors, successfully resisted pressures from the Bank and some other donors to conduct a (purely) economic evaluation of each road". (PCR)
5.01 The review shows that about one project in eight was affected by technical problems (Table 5.1), with transportation appraised projects very significantly less affected than others. Although technical problems have reduced over time, several aspects of this type of problem are still very relevant.
5.02 Design standards have varied widely between projects (Annex 6). In general, design has been via set geometric standards based on design speed and safety considerations rather than in relation to specific serviceability requirements defined in terms of access by types of vehicle and seasons. Roads have been planned with a seven meter wide carriageway plus shoulders, for traffic of 20 to 30 vpd. 16/ Unnecessarily high standards affect both cost and program output over time. The Feeder Road and Highway Maintenance project in Côte d'Ivoire, for example, constructed roads well above appraisal recommendations, with the result that the length of road constructed fell far short of plans. When projects are defined as a list of specific road sections there is the tendency for both geometric and wearing course standards to creep upward (Box 5.1).
The early enclave ADP projects in Nigeria proposed uniform minimum construction standards whereby the roads would be unsurfaced, and provide a right of way of 12 meters, and a carriageway of 5 meters. However, the PPAR states that only surfaced roads (with 100 to 150 mm of laterite) were built eventually with the argument that "the roads will generate much traffic and the vehicles using them were heavier that expected." The other specifications adopted followed closely the SAR.
The carriageway of some of the roads constructed in the MSADP varied between 7 and 10 meters against a suggested width of 4.5 meters. This difference lead to a substantial increase in rehabilitation and maintenance costs.
16/ See PPAR on the World Bank's Cameroon Feeder Road Project, 1989, para 3.12.
procedures. In Malawi's DRIMP program, there has been more concentration on culverts and better drainage, which reduces later road maintenance problems. 17/ Recent projects in Botswana, Zaire, Kenya and Ghana have set lower and more realistic standards.
5.05 Proposal to lower standards is likely to meet stiff opposition from SSA road authorities. The objective is to optimize resource allocation over a given network instead of providing set width and speed for a few selected roads. Most of the benefits of improved rural mobility can accrue without year-round vehicular access, so long as services can be ensured during critical periods. The optimum solution will in many instances involve spot improvements to existing tracks, designed to drain waterlogged areas and provide a more durable running surface over poor soils and on steep gradients. Such an approach calls for more on-site design and supervision than does construction to engineered standards. 18/ In conclusion, design methodologies need a fresh look to ensure that the emphasis is placed on access and durability rather than on geometry and speed.
5.06 One of the key elements of rural gravel and earth road construction and maintenance is the provision of sufficient drainage -- surface and side drainage (by camber or cross-slopes, and side ditches), and stream and river crossings (i.e., culverts, causeways or also known as drifts or fords, and bridges). Many rural roads and tracks whose surfaces consist of local materials, either naturally occurring on the road or imported from nearby sources, are quite adequate structurally when traffic is light weight and low volume, and the wearing course surface is well drained and has sun exposure. However, poor drainage is responsible for most of the structural deficiencies of these roads because the wearing courses become waterlogged and soften, or because unrestrained or uncontrolled water flows cause erosion or scouring.
5.07 Unpaved road surfaces must be sloped (with camber of up to 5%) to remove standing water and to prevent softening and surface slipperiness after rains. Unfortunately this is often compromised with during construction, or neglected in maintenance. Side drains over 2-3% gradient usually need frequent scour checks and turn outs (miter drains), and must sometimes be provided with cross-drainage pipes to ensure good lateral drainage. Both machine and hand labor methods have been successfully used to construct good drains for rural roads. Their continued good performance depends on the consistency in maintaining the original camber specifications, and to keep the drains clear of debris. Drainage structures have usually been an integral part of rural roads design and construction, and much has already been written on this topic. 19/ Therefore, detailed design and construction aspects are not covered in the present paper. Given the importance of good drainage for adequate performance of rural gravel and earth roads it is essential that drainage specifications are clearly defined and disseminated.
17/ Relf, C., 1987, "Malawi's District Road Improvement and Maintenance Program", ILO Report CTP 74, Geneva, paras 3.41 through 3.44.
18/ The PCR for the Upper Volta Rural Roads Projects comments "The main reason for continuous graveling was to avoid the need for scarce and costly managerial inputs that adequate supervision of appropriate use of variable standards ... would have required".
19/ Drainage considerations for rural roads design, construction and maintenance have been adequately described in Transportation Research Board, 1978, "Transportation Technology Support for Developing Countries" Compendiums Nos. 1,2,3,4, 5, National Academy of Sciences, Washington, D.C.; and H. L. Beenhakker, S. Carapetis, L. Crowther and S. Hertel, 1987, "Rural Transport Services", Intermediate Technology Publications, U.K.
20/ Operational Directive Number 4.00 of October 31, 1989 provides guidelines for Environmental assessment in Bank projects.
21/ Sinha, K., Varma, A., Walsh, M.P., and Faiz, A., 1990, "Environmental and Ecological Considerations in Land Transport: A Resource Guide," Infrastructure and Urban Development Department, Report No. INU 41, World Bank, Washington, D.C., and Sinha, K., Varma, A., and Walsh, M.P., 1990, "Land Transport and Air Pollution in Developing Countries," by , Infrastructure and Urban Development Department, Report No. INU 60, World Bank, Washington, D.C..
22/ See Heggie, I., 1990, "Designing Environmentally Sound Transport Projects", Infrastructure Note, Transportation No. ENV-1, Infrastructure and Urban Development Department, World Bank, Washington, D.C.
gravel borrow pits after use. The borrow pit restoration aspect, in particular, must be clearly specified and enforced in engineering contracts. By ensuring proper drainage and location of borrow pits, much of the adverse environmental impact from rural roads projects can be avoided.
5.12 The indirect impact includes changes in land use patterns, and access to markets likely to occur when new rural roads are constructed. Although some of these may result in positive economic impact, some adverse ecological impact (e.g., increased accessibility to forests with increased depletion of trees for farming and charcoal production, and using primary hard wood species for drainage structures) are likely. Although these aspects may be addressed through other complementary interventions (e.g., replanting trees, etc.), the environmental impact of road access and settlements should be included in comprehensive land use plans.
5.13 The review shows that equipment based methods have normally been used for rural road construction and rehabilitation, and sometimes also for maintenance. Labor based methods were used or specified in only 14 road construction projects (16%) and in 19 road maintenance projects (20%). Labor based technology was specified more often in transport appraised than in agriculture appraised projects. Use of labor based methods for rural road maintenance has increased since 1980 (Table 5.1).
| AGR. | Pre-1980 TRP |
AGR. | 1980-89 TRP |
TOTAL AGR. |
TRP | |
|---|---|---|---|---|---|---|
| Construction Technology | ||||||
| Labor Based (LB) | 1 | 3 | 1 | 2 | 2 | 5 |
| Equipment | 10 | 3 | 7 | 3 | 17 | 6 |
| LB and Equip. | 0 | 4 | 0(1) | 3(1) | 0 | 7 |
| Not Specified | 28 | 30 | 20 | 7(1) | 48 | 37 |
| Maintenance Technology | ||||||
| Labor Based (LB) | 1 | 4 | 4(1) | 6(1) | 5 | 10 |
| Equipment | 2 | 1 | 4 | 1 | 6 | 2 |
| LB and Equipment | 0 | 3 | 0 | 1(1) | 0 | 4 |
| Not Specified | 36 | 32 | 20 | 7 | 56 | 39 |
5.14 The review shows that there have been difficulties in achieving efficient use of equipment (para 5.13), and labor based methods of road construction seemed to have been a viable alternative in Lesotho, Botswana, Madagascar, Kenya, Malawi and Ghana (Box 5.2), as well as in Benin. 23/ Under suitable conditions, labor based rehabilitation of rural roads has been reported to be 15 percent cheaper than using equipment, with a 40 percent saving in foreign exchange. In Kenya, the Bank and ILO found that labor based force account construction was 40 to 50 per cent cheaper than equipment based methods, and 50 to 60 percent less in economic terms. On the other hand, experiences with a German funded pilot labor based construction in Niger, where costs were very high, persuaded the Bank not to advocate its use in their projects there. Table 5.1 indicates that, unlike maintenance, there has been no significant increase in the use of labor based methods for rural road construction in later projects compared to earlier, although pilot schemes are proposed in some recently approved projects.
The success of the RARP in Kenya has paved the way for other countries and the ongoing Minor Roads Program (MRP) in Kenya to implement rural road programs with labor based methods. At appraisal of the RARP the Government wanted to set up 74 construction units in 26 districts, 8 of which were to be financed by the Bank. Each unit was expected to undertake labor-based road construction with equipment provided for the hauling of gravel. Each unit was headed by an inspector and employed 250 casual laborers, divided among seven sub-units (one administrative, two earthwork, two drainage, one graveling and one quarry). A senior inspector was to be in charge of four units, and to report to the Rural Access Roads Engineer in Headquarters. Forty-five units were established (only 8 financed by the Bank) by the end of the RARP in 1984. The organization proved effective and cost efficient. Road maintenance is the responsibility of the District Engineer, who is assisted by 1 or 2 inspectors and by 1 to 4 overseers depending on the length of roads in the district. Routine maintenance is executed using the lengthman system with local people acting as contractors and taking care of 1.0 to 2.0 kilometers of road. Each contractor is paid the equivalent of 3 days a week of casual labor with the consent of the overseer who ensures that all maintenance work needed has been performed. In order to avoid discrepancies, the Ministry has started to develop productivity standards for the contractors.
23/ See Project Performance Audit Report for Benin First and Second Feeder Road Projects, 1986. Another successful implementation of labor based methods has been the DRIMP in Malawi. Even though maintenance has been attempted using the lengthman system, its implementation has had some flaws. In theory, under this scheme, the maintenance of a section of road (1-3 kilometers) is the responsibility of one person. Tools and training are provided. The lengthman receives payments upon approval of each section's maintenance standard. In order to avoid fraud, the supervision is usually assigned to a different person than the one paying salaries. The time requirements imposed by road maintenance activities are such that they can be accommodated with time requirements of agricultural activities. In practice, the system described above has not been implemented. (DRIMP, Phase VI, Final Report). The work has been carried out by groups of 5 to 6 laborers directed by a capitao (gang leader). Both routine and periodic maintenance activities are carried out in this way. The size of the groups varies during the year, but reaches a peak in the wet season. In this way, there is no accountability by individuals, and this has led to poor maintenance practices in many districts. The report for DRIMP Phase IV, recommended that the capitao should only be employed when larger gangs are required, such as for periodic maintenance. Routine maintenance could be efficiently carried out with the lengthman system and with foremen in charge of a group of lengthmen (10 lengthmen to a foreman).
5.19 Chronic foreign exchange shortages in SSA are, prima facie, a good reason to reduce equipment use wherever possible. This argument is strengthened by the endemic problems relating to equipment use revealed by the project review. Fuel shortages, delays in procurement for both equipment and spares, unbalanced and heterogeneous fleet, inappropriate types of equipment, poor work planning, lack of understanding of equipment use and poorly trained and motivated operators, have all been reported. 24/ These add up to a situation where the true cost of earthmoving, for example, may be ten times the estimate, the balance being concealed in expenditures apparently unrelated to the works, and in the fact that planned work programs are not completed, although funds may be spent. 25/
24/ The PCR for the Cameroon Feeder Road Project reported 18 months delay in delivery (para 3.02), and for Upper Volta Rural Road Project, two years to procure spares (para 3.02); Benin First and Second Feeder Road Project PCR reported late delivery and poor performance of equipment (para 3.06), while procurement problems were a factor in the Gambia Highway Maintenance Project. The Ethiopia First Sector Credit suffered from fuel and spares shortages, as well as delays in equipment procurement. The timing of work in the Zaire Fourth Highway Project and in the Liberia Feeder Road Project was upset for the same reasons. In Niger's First Feeder Roads Project, equipment costs increased 90 percent due to changes in standards and poorly maintained equipment, while the cost of fuel, lubricants and spares were double the estimates.
25/ Project costs increase rapidly due to poor equipment operation. In the Mali Third Highway Project, only 856 km of the proposed 1200 km
5.20 Although conditions in SSA and the weight of project evidence favors labor based work for rural roads, making the change from equipment-based methods is neither quick nor simple. Equipment will always be required for some operations, and some types of intermediate technology equipment now available is likely to be successful on small scale and scattered rural road works. 26/
5.21 Construction and rehabilitation of rural roads by contract was advocated in about 27 percent of transportation projects, but in only 4 percent of others (Table 5.2). Contractors undertook road maintenance in less than 5 percent of the projects reviewed.
| Pre-1980 | 1980-89 | TOTAL | ||||
|---|---|---|---|---|---|---|
| AGR. | TRP | AGR. | TRP | AGR. | TRP | |
| Management Responsibility | ||||||
| Central Government | 37 | 33 | 18(1) | 10 | 55 | 43 |
| Local or State Govt. | 1 | 1 | 8 | 1 | 9 | 2 |
| Local Community | 0 | 0 | 0 | 0 | 0 | 0 |
| Not Applicable | 1 | 6 | 2 | 4 | 3 | 10 |
| Implementation | ||||||
| Force Account by: | ||||||
| Central Government | 9 | 16 | 5 | 9 | 14 | 25 |
| Local or State Govt. | 1 | 1 | 1 | 1 | 2 | 2 |
| Special Project Unit | 23 | 1 | 12 | 0 | 35 | 1 |
| Contractor: | 3 | 11 | 5(1) | 0 | 8 | 11 |
| Mixed Contractor and | ||||||
| Force Account: | 2 | 5 | 3 | 1 | 5 | 6 |
| Not Specified/ | ||||||
| Applicable: | 1 | 6 | 2 | 4 | 3 | 10 |
| All Projects | 39 | 40 | 28(1) | 15 | 67 | 55 |
of road were completed, due to equipment, spares and fuel problems.
26/ Towed graders, now manufactured in SSA, are a lower cost and suitable alternative to heavy imported power graders. Locally made bottom dump trailers towed by agricultural type tractors are suitable to transport materials over short hauls. The Technology Unit in Kenya's Ministry of Public Works has reported on performance of locally produced tools and equipment.
5.22 Despite general support for greater use of contractors, competent domestic contractors are only to be found in a few SSA countries, and they are mostly interested in construction, rehabilitation and the types of maintenance that require mechanical equipment. A notable case is the recent development of private contractor capacity for labor-based work in Ghana, which has been supported by the Bank, ILO and bilateral donors (Box 5.3). There are important regional differences in the availability of contractors which need to be investigated during project preparation, as has been done for the multi-state Agricultural Development Projects (MSADPs) in Nigeria and for the proposed Rural Infrastructure Project in Cameroon. 27/ Little is reported or known about the capacity of petty contractors in SSA for routine manual maintenance of rural roads. Manual routine maintenance using the lengthman system has been considered in a few projects, 28/ but there seems to have been little attention given to development of the necessary supervisory capacity for their work.
Ghana presents an example in SSA where labor-based rehabilitation has been carried out by contractors. In 1985, with the assistance of an IDA credit and UNDP/ILO technical assistance, the young Department of Feeder Roads (DFR) started implementing a unique project using local laborbased contractors. A pilot project in the Western Region (cocoa areas) was first established in 1986. This program included a 23 week course for contractors, supervisors, and DFR staff, all of whom were being exposed to this technology for the first time. During the training, the participants completed the rehabilitation of a 10 kilometer road at a training model site, using labor from local villages. At the end of the training the contractors were provided with 4-year loans to buy their own set of tools and light equipment to carry out labor-based contracts. The equipment comprised a tipper truck, tractors and trailers, pedestrian vibratory roller, water tank, water pump, and a complete set of hand tools. Following the training stage each of the contractors was awarded a 5 kilometer trial contract to allow DFR to assess their performance. Technical advice and close supervision are still provided by ILO and DFR engineers. The contractors performed well during the trial contract (2 km per month) and received a standard contract for 25 kilometers (one year). After three courses, 21 contractors have been trained with a potential output of approximately 500 kilometers per year.
Source: UNDP/ILO, 1990, "Feeder Roads Improvement in Ghana".
5.23 The case for greater use of contractors in road maintenance is well argued in the World Bank's 1981 publication 'The Road Maintenance Problem and International Assistance', but the change over from Force Account operations takes time and careful preparation to assess strengths and weaknesses of the local industry. 29/ Local construction firms in SSA usually lack the experience needed to manage unit price contracts obtained through competitive bidding. They have difficulties in satisfying all the terms
27/ The SAR for the first Multi-State Agricultural Development Project (MSADP) reports that 'a study was completed in Anambra State to establish the availability of contractors.... and similar studies have been launched in other states'. SARs for the recent second and third MSADPs report that 'there are adequate interested contractors', indicating that similar investigations were carried out.
28/ Spot Improvement and Maintenance Units in Ghana (SIAM), Kenya RARP, and proposed in the Third MSADP, Nigeria, the National Infrastructure Project in Guinea, and the Infrastructure Rehabilitation Project in Guinea-Bissau.
29/ See supervision report of February 1989, Nigeria ADP project: Memo from L.Campbell to A. Seth on 'Thematic Supervision: Feeder Roads and Water Supply Components of ADPs'.
and conditions of bidding, the general conditions of contract and the specifications. They frequently assume that they can bid low prices with the expectation of being able to raise them during implementation. Special measures are needed to facilitate the development of domestic firms; experience with past efforts points out the importance of policy and regulation concerning public procurement.
5.24 The small scale and scattered locations of rural road work raises serious problems of management and supervision for Force Account work. Contract work can ease but not eliminate these problems, since the contractor is less constrained and better motivated since payments, hence expenditure, are linked with outputs. However, the supervision of scattered contractors raises special problems of control, deployment and training, which have generally not yet been fully recognized. Provided proper attention is paid to the build-up of capabilities for supervision and administration of contracts, and a system is found to make timely and reliable payments, rural roads programs can be suitable means by which to develop the local construction industry.
The NORAD project has recommended measures to alleviate the constraints and set targets of 30 to 50 percent female participation.
5.27 Participation of women has the potential to: (1) increase women's off-farm incomes, (2) strengthen technical and leadership skills, (3) disseminate labor-saving equipment (including IMT), and (4) support women enterprise development (e.g., contractor training). Rural road programs should consider measures to facilitate the participation of women at all levels including supervisors and contractors. These measures may include provision of childcare services, and flexible hours. 30/
30/ See Kudat, A., undated, " Participation of Women in Rural Road Maintenance in Sub-Saharan Africa", World Bank, Washington, D.C., which suggests practical means to increase the role of women in rural roads and transport.
6.01 Problems associated with resource mobilization were the second most common among the projects reviewed. They were less common during period II (1980-89), affecting 10 percent of projects compared with 37 percent earlier. Incidence of these problems in transportation and other projects showed no significant difference. Resource mobilization problems are considered under the two main headings of financial and human resources.
in the Shaba region of Zaire. 31/ Further investigations of positive responses could be useful to provide guidance on these crucial aspects.
6.07 The delegation of maintenance (i.e., funding and operations) to local authorities has generally not provided a satisfactory solution. In Nigeria and Tanzania, where they have this responsibility, there have been serious funding problems. In Malawi, the DRIMP program made significant improvements in the network, but local authorities were quite unable to handle the resulting large increase in maintenance requirements. Recent projects have tried to include local authorities in the planning and route selection process from the start, so that they shall come to understand and accept the benefits of maintaining the roads.
6.08 Voluntary labor has been used as a means to reduce the local funding requirement, and has sometimes worked well on construction, but is unlikely to be applicable to maintenance. The experience with mobilization of local labor on a voluntary basis is on the whole negative with the possible exception of Rwanda where the Umuganda system (each adult to devote one day per week to work organized by the 'secteur' i.e., lowest echelon of administrative and political organizations about 100 households) relies on relatively well structured local authorities with strong political legitimacy. The high population densities and hence short distances between the work site and home is also a positive factor. As a rule it seems that application of field voluntary labor may be limited to emergency work and to work in the immediate vicinity of the communities involved, in particular off-road paths and tracks.
31/ See Siegel, L., et al., 1989,"Decentralized Finance and Management of Road Maintenance in Zaire", Associates for Rural Development Inc. for USAID, and Groupe Huit-Brees, 1989, "Finances Communales et Perspective de Développement Municipal au Cameroun" Department of Local Councils, Cameroun.
| Pre-1980 1980-89 TOTAL |
||||||
|---|---|---|---|---|---|---|
| AGR | TRP | AGR | TRP | AGR | TRP | |
| Well Planned | 7 | 16 | 4 | 5 | 11 | 21 |
| Incompletely Planned | 15 | 8 | 4(1) | 1 | 19 | 9 |
| Not Specified | 17 | 16 | 20 | 9(1) | 37 | 25 |
Source: Various Bank Appraisal Reports and Country Data
32/ See manuscript "Food Aid and Development in MADIA Countries", paper by Mellor and Pandya-Lorch (International Food Policy Research Institute, Washington D.C.) 1990.
| Table 6.2. Maintenance Institutions | | | | | | | | | | | |-------------------------------------|------|----------|------|---------|-------|-----|--|--|--|--| | | | Pre-1980 | | 1980-89 | TOTAL | | | | | | | | AGR. | TRP | AGR. | TRP | AGR. | TRP | | | | | | Existing | 6 | 5 | 1(1) | 4 | 7 | 9 | | | | | | Well Planned | 5 | 17 | 6 | 8 | 11 | 25 | | | | | | Incompletely Planned | 12 | 4 | 18 | 3(1) | 30 | 7 | | | | | | Not Specified | 16 | 14 | 3 | 0(1) | 19 | 14 | | | | |
(1) represent projects not yet approved by the Board (as of 11/15/89)
Source: Various Bank Appraisal Reports and Country Data
6.13 Bank experience offers no ready-made solution to the central problem of mobilization of local resources for maintenance of rural roads. Early involvement of local government in planning seems to be beneficial in building up awareness, but in the long term they must have some reliable means to raise funds themselves. The Bank's Colombia Rural Roads Projects offers an interesting experience; a fairly competent centralized agency built up over time a number of regional authorities, who are able to raise funds through
33/ This has been only part of the problem. Lack of equipment and spares for Force Account work, and procedural complications for contracts, have caused delays. During 1987-8, only one state (Cross River) was up to schedule. Other progress has ranged from disastrous (Benue) up to satisfactory.
local taxes (Box 6.1). The FNCV (Fondo Nacional de Caminos Vecinales) and its local authorities (Juntas de Caminos) have established their credibility and competence and have been able to mobilize matching funds to complement central allocations. Their example underlines the need for a specific funding line for rural roads.
A good example of how responsibility for rural roads can devolve from central authority was in Colombia, where the World Bank has been concerned with road transport since 1950, but in rural roads only since 1980. A 1989 evaluation of the rural road project comments that "prospects for project sustainability are good." A rural road authority (Fondo Nacional de Caminos Vecinales - FNCV) was set up in the 1960's initially under central government, but has operated since 1972 as an autonomous rural roads agency. Over the years, FNCV has moved away from central into local government, where about 90 per cent of FNCV staff now operates, leaving only a policy and overall planning function in central government. In addition, to qualities listed above that contributed to successful rural roads development in Colombia, FNCV has had some earmarked revenues from a share in taxes and duties, which was matched by funds mobilized locally. The funds, have, however, been insufficient for maintenance and as part of a proposed follow-on project, assistance is planned to ensure funding for rural road maintenance.
7.01 In many countries the development of rural roads has been hampered by the lack of proper institutional arrangements. While central road agencies have usually played a key role in rural road management, other departments have frequently been involved in specific aspects of planning and funding, via a special project unit or in an ad-hoc basis. Institutional performance is considered here under the main headings of: (i) rural road units within central road authorities; (ii) special project units and agricultural parastatals; and (iii) local institutions and communities.
7.02 The institutional problems that beset central roads authorities have been adequately described in a number of reports and papers, 34/ and they apply equally to rural road units. Where special rural road units or departments have been set up, although they may have experienced the same institutional problems as their parent Ministry, they have nevertheless been able to serve as a central focal point for policy and planning for rural roads, and as a channel for earmarked funds. Successful examples of this are to be found in Benin's Service des Routes de Desserte Rurale (SRDR), Togo's Service National des Pistes Rurales (SNPR) and Ghana's Department of Feeder Roads (DFR).
7.03 Kenya's RARP, set up within the Special Programs Branch of the Roads Department, quickly attracted donor support, plus technical help from ILO. It succeeded because it was placed within a ministerial structure that already had a well-established record for administration of roads. The same can be said of DFR in Ghana. On the other hand, where the institutional abilities of the parent ministry have not been well assessed, high expectations have not been fulfilled. In Cameroon's First Feeder Road Project, for example, objectives were not met because the Feeder Road Unit set up within the Department of Highways was not managed properly. Procurement contracts were not awarded until after bid expiry, withdrawal applications were late, a construction contract was awarded against Bank guidelines, and slow payments to suppliers caused spares and fuel shortages, although funds were available. All of these are clear indications of poor institutional performance.
7.04 A characteristic of the more successful operations is that they were self sufficient and able to operate with reasonable autonomy. During the First Feeder Road Project in Senegal, there was a very real improvement after the unit became autonomous. 35/ Two ingredients were identified as instrumental in the transformation: (i) direct control by the unit over small, but important, expenditures; and (ii) a technically and administratively experienced local management which set production goals, clearly communicated them to staff, followed up on performance and did not hesitate to remove poor performers. The unit thus came to operate more like a contractor, but orientated to achieving maximum production with given funds rather than to making a profit.
34/ See World Bank, 1981, "Road Maintenance Problems and International Assistance" World Bank, Washington, D.C., and World Bank, 1989, "Road Deterioration in Developing Countries" World Bank Policy Paper, World Bank, 1989, "Road Deterioration in Sub-Saharan Africa" and supporting RMI papers (SSATP).
35/ The Bank had threatened to stop the project in 1979, which caused a change in policy. It is reported that the change 'caused resentment' within the Ministry, and the arrangement could only be kept in place because it was financed by foreign funding.
7.05 Experience in Ethiopia's Road Sector Project was different, and less encouraging. The Transport Construction Authority (ETCA) was unenthusiastic about the creation of what it saw as a competing road building bureaucracy in the form of a semi-autonomous Rural Roads Organization (RRO). The project had planned for a total of 14 mechanical workshops to service the needs of rural roads equipment under RRO. Opposition to the changes prevailed and, eventually with Bank consent, RRO became simply another department of ETCA.
7.06 Project units set up in Ministries of Agriculture, or within parastatals (development companies or 'filière'), have generally lead to high construction costs driven by fixed equipment expenditures and high overheads. Another problem has arisen upon completion when project units have often been disbanded or have gone to other work leaving no institutional arrangements for maintenance. Finally coordination with institutions outside the projects has generally been lacking. In the earlier projects, special units usually carried out construction by Force Account. As these units would typically disappear at the end of the project, little long term institutional benefit resulted, either from the formation of effective government organizations, or from building up local contractor capacity.
7.07 Where units are part of an agricultural parastatal, their responsibilities may overlap with those of other government agencies for funding and constructing rural roads. In Cameroon, for example, present investment in rural roads is mostly via agricultural parastatals, and some of these maintain roads which are also in the Roads Ministry budget. It is important that responsibility for the administration of rural roads is made very clear, which implies that the coordination necessary between units and other authorities must be well defined during project preparation.
7.08 The issue of classification and management of feeder roads after project completion has to be clarified during project preparation, as it will affect future maintenance prospects. In Mali, feeder roads built as part of the first highway projects were not maintained because they had not been officially classified as part of the road network. Similarly, the Ministry of Public Works refused to classify, and thereby adopt for maintenance, roads built by SODECOTON in Cameroon's Northern Province Rural Development project, with the result that maintenance was not done.
7.09 Local institutions and communities (which include local government below state level), have usually been involved in rural road projects at the planning stage and in maintenance. So far as maintenance is concerned, results have been disappointing. Lack of financial resources and trained personnel are obvious reasons, but insufficient consideration at appraisal and during project implementation of ways to include local interests has been a factor.
7.10 Malawi's DRIMP program illustrates the difficulties of transferring responsibility for rural road maintenance to local organizations. Although the program has been implemented in 21 out of 24 districts, responsibility for maintenance has been transferred in only one (Kasungu) where a pilot program is in place. Major contributions have been made to institutional development both at district and central level in respect of road maintenance, according to the first stage PPAR, but in spite of this, the inability to hand over maintenance to districts has been due to their lack of organizational, technical and managerial resources. 36/
36/ Relf, C., "The District Road Improvement and Maintenance Program, an Evaluative Study" ILO, Geneva, 1986.
37/ Rural roads are not alone in this respect. See OED report no. 5085 "Institutional Development in Africa: A Review of World Bank Project Experience" May 1984, Summary Findings, p. iv, para 5.
38/ Road components of irrigation and agricultural projects in India have been handled for some years -apparently successfully - by special staff, including a highway engineer, attached to the Resident Mission, New Delhi.
8.05 The Bank will continue to support rural roads through a number of channels, and a major objective should be to foster development of an agreed policy framework and associated institutional capacity for rural road construction, improvement and maintenance. One project in each country – either a rural road or rural infrastructure project, or broader highway or transportation project – should be designated as the vehicle to introduce and support the development of rural road policy and institutional capabilities, so as to ensure a coherent framework for rural roads components of operations carried out in other sectors, in particular, agriculture. The long-term nature of policy and institutional objectives must be recognized. Thus, such institutional development and capacity building can be achieved only after a series of operations.
8.06 The positive experience of the Regional Feeder Roads Unit in Abidjan in focussing attention on the problems of the sub-sector suggest the possible use of regional centers to increase the Bank's project preparation and supervision capacity for rural roads projects in the region. Better coordination between donors over rural road policies, and greater interchange of expertise and experience, particularly with ILO, will help to raise the success rate of rural road projects.
9.01 The policy recommendations that emerge from this review relate to specific country policy actions, Bank project operations, and studies, research, and dissemination.
9.06 The Rural Travel and Transport Component of SSATP provides a framework to pursue further study of the outstanding issues of rural road and transport policy. The following is planned over the next eighteen months:
These promotional activities could effectively apply the Training and Visit approach used in agricultural extension.
The objective would be for each participating country to develop plans as part of its rural road and transport strategy to initiate required policy changes in their own country.
| C nt ou r y |
D i vi si on |
P j t ro ec |
C red i t L oa n |
A p pr Y ea r |
T ot al A t mo un |
O ri gi l na P ri i l nc pa |
A t mo un f R l or ura R d oa s |
A p |
i l R d pra sa oa |
K ms |
A | ct l R d ua oa |
K ms |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ( S \$ ) U i l l i m on |
C st on |
R eh ab |
M ai nt |
C st on |
R eh ab |
M ai nt |
|||||||
| B i en n |
G A |
u C Z -B ot t ou or go on |
C- 3 0 7 |
7 2 |
1 2 .7 |
6 .1 |
0 .7 |
6 1 0 |
4 9 0 |
||||
| B i en n |
T R |
F d R d ee er oa s |
C- 7 1 7 |
7 7 |
6 .1 |
5 .5 |
5 .5 |
8 4 5 |
4 2 5 |
3 4 4 |
0 | ||
| B i en n |
T R |
2 nd F d R d ee er oa s |
C- 1 0 9 0 |
8 0 |
8 .7 |
7 .0 |
7 .0 |
7 0 0 |
8 0 0 |
6 9 0 |
4 2 5 |
||
| B i en n |
T R |
d 3r F d R d ee er oa s |
C- 1 4 8 5 / F- 0 2 3 |
8 4 |
1 3 .2 |
1 2 .0 |
1 2 .0 |
8 4 0 |
2 0 0 0 |
7 2 0 |
|||
| B i en n |
A G |
d 2n B u R .D or go |
C- 1 8 7 7 |
8 8 |
6 7 .3 |
2 1 .0 |
4 .9 |
3 0 0 |
3 0 0 |
||||
| B k i ur na |
A G |
D gh t R el i ef F d ro un u |
C- 4 4 2 |
7 3 |
1 4 .0 |
2 .0 |
? | 8 0 0 |
3 6 6 |
||||
| B k i ur na |
T R |
R l R d ura oa s |
C .5 7 9 |
7 5 |
8 .5 |
7 .5 |
7 .5 |
1 2 0 0 |
3 3 0 0 |
||||
| C am er oo n |
T R |
d 2n H i gh wa y |
L- 9 3 5 / C- 4 2 9 |
7 3 |
7 1 .0 |
4 8 .0 |
1 .1 |
||||||
| C am er oo n |
A G |
C P j t oc oa ro ec |
L- 1 0 3 9 |
7 4 |
2 3 .8 |
6 .5 |
2 .1 |
9 0 6 |
6 0 6 |
||||
| C am er oo n |
T R |
F d R d ee er oa s |
C- 7 4 9 |
7 7 |
2 1 .1 |
6 .5 |
6 .5 |
2 2 0 0 |
8 0 0 |
||||
| C am er oo n |
A G |
d 2n S E M R Y R i ce |
C- 7 6 3 |
7 8 |
5 5 .5 |
2 9 .0 |
0 .7 |
5 0 |
|||||
| C am er oo n |
A G |
N t h n P i or er rov nc e |
L- 1 9 1 9 / C- 1 0 7 5 |
8 0 |
7 4 .7 |
3 7 .5 |
1 0 .0 |
8 0 0 B |
6 0 0 |
||||
| C am er oo n |
A G |
d 2n W t n P i es er rov nc e |
L- 2 4 0 6 |
8 4 |
5 5 .7 |
2 1 .5 |
4 .5 |
5 0 0 B |
|||||
| C am er oo n |
A G |
d 2n F S A R ( R .D ) |
L- 2 5 6 7 |
8 5 |
5 6 .6 |
2 5 .5 |
4 .0 |
3 5 0 |
3 5 0 |
||||
| C am er oo n |
A G |
C R eh ab i l i t at i oc oa on |
L- 2 9 1 2 |
8 8 |
2 8 5 .4 |
1 0 3 .0 |
1 9 .6 |
1 3 5 0 |
2 4 0 0 A |
3 0 0 0 A |
|||
| C h ad |
A G |
S at i- D si I rri e gu er es a |
C- 4 8 9 |
7 4 |
1 2 .0 |
7 .5 |
1 .4 |
1 0 2 |
|||||
| C h ad |
T R |
d 2n H i gh wa y |
C- 4 9 0 |
7 4 |
3 .5 |
3 .5 |
1 .3 |
8 0 0 |
8 0 0 |
||||
| C h ad |
T R |
R l P j s F d t ura ro ec un |
C- 6 6 4 |
7 6 |
1 3 .4 |
1 2 .0 |
1 .2 |
2 3 0 0 R |
|||||
| C e d ' I i ot vo re |
A G |
d 2n C oc oa |
L- 1 0 6 9 |
7 4 |
3 4 .7 |
2 0 .0 |
2 .8 |
2 7 0 |
4 0 |
||||
| C e d ' I i ot vo re |
A G |
C A R .D ot t on rea |
L- 1 0 7 7 |
7 5 |
5 2 .5 |
3 1 .0 |
6 .5 |
9 2 0 |
|||||
| C e d ' I i ot vo re |
A G |
4t h P al O i l & C ut m oc on |
L- 1 3 8 2 |
7 7 |
4 0 .6 |
2 0 .0 |
1 4 .9 |
1 0 9 5 |
|||||
| C e d ' I i ot vo re |
T R |
F d R d & H ee er oa w y M ai n |
L- 1 0 1 5 |
7 7 |
6 3 .2 |
2 9 .0 |
1 2 .4 |
3 6 0 0 |
0 0 0 5 |
1 3 0 0 |
|||
| C ot e d ' I i vo re |
A G |
d 2n G nd -B eb ra er y R ub b er |
L- 1 5 7 5 |
7 8 |
6 0 .4 |
2 0 .0 |
0 .7 |
9 1 0 |
|||||
| C e d ' I i ot vo re |
T R |
d 2n H y S L t w ec or oa n |
L- 2 8 1 / B- 0 1 3 1 5 |
8 5 |
2 3 0 .7 |
1 1 8 .0 |
1 6 .9 |
1 9 . G 7 |
1 8 6 |
||||
| C nt ou r y |
D i vi si on |
P j t ro ec |
C red i L t oa n |
A p pr Y ea r |
T al ot A t mo un |
O ri gi l na P ri i l nc pa |
A t mo un f R l or ura R d oa s |
A p |
i l R d pra sa oa |
K ms |
A | l R d ct ua oa |
K ms |
| C .A .R |
A G |
C ot t A R .D on rea |
C- 1 3 7 6 |
8 3 |
5 1 .2 |
1 0 .4 |
4 .4 |
9 5 0 |
2 3 0 0 |
||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| C .A .R |
A G |
N i al L i k at st on ve oc |
C- 1 6 8 1 |
8 6 |
3 7 .3 |
1 1 .9 |
1 .5 |
6 0 0 |
|||||
| E h i pi t o a |
A G |
W ol o A D am g. ev |
C- 1 6 9 |
6 9 |
5 .1 |
0 .2 |
3 .9 |
3 7 5 |
4 7 9 |
||||
| E h i pi t o a |
T R |
5t h H i gh wa y |
C- 3 3 2 |
2 7 |
2 2 .0 |
1 .0 1 4 .4 7 |
4 3 0 |
||||||
| E h i pi t o a |
A G |
C of f P si ee roc es n g |
C- 2 9 0 |
2 7 |
1 0 .3 |
6 .3 |
1 .6 |
4 0 0 |
3 6 7 |
||||
| E h i pi t o a |
T R |
h 6t h i gh wa y |
C- 2 5 5 |
7 5 |
4 5 .7 |
3 2 .0 |
3 1 .6 |
3 9 G 7 |
|||||
| E h i pi t o a |
T R |
R d S t oa ec or |
C- 0 8 7 |
7 7 |
3 6 8 .0 |
3 2 .0 |
6 .3 |
2 6 .4 3 |
2 2 1 5 |
||||
| E t h i pi o a |
G A |
d 2n C of f ee |
C- 1 2 9 4 |
8 3 |
.0 5 7 |
3 .0 5 |
.0 7 |
1 0 5 |
3 0 0 |
3 2 0 B |
|||
| E t h i pi o a |
T R |
S R d t oa ec or |
C- 1 4 0 4 |
8 3 |
7 0 .0 |
7 0 .0 |
3 0 .9 |
3 6 .7 0 |
|||||
| G ab on |
T R |
R d M ai nt oa en an ce |
L- 3 0 4 6 |
8 9 |
1 1 0 .0 |
3 0 .0 |
1 0 .8 |
2 8 0 0 |
|||||
| G h an a |
T R |
d 2n H i gh wa y |
L- 1 1 8 2 |
7 5 |
3 6 .8 |
1 8 .0 |
1 0 .9 |
0 | 6 0 0 0 |
4 3 6 |
2 0 0 0 |
||
| G h an a |
A G |
V ol t a A D g. ev |
C- 1 0 0 9 |
8 0 |
4 9 .8 |
2 9 .5 |
2 .7 |
6 4 8 B |
|||||
| G h an a |
T R |
R d R eh ab oa |
C- 1 6 0 1 |
8 5 |
1 0 8 .0 |
4 0 .0 |
2 .5 |
2 0 0 |
2 0 0 0 |
||||
| G ui ne a |
A G |
G ck ed A D ue ou g. ev |
C- 1 6 3 5 |
8 5 |
2 5 .2 |
6 .6 |
2 .6 |
2 4 0 |
5 0 0 |
||||
| K en ya |
T R |
T R d P j t ea oa ro ec |
C- 0 7 7 |
6 5 |
4 .2 |
3 .6 |
3 .6 |
1 3 0 0 B |
1 3 0 0 |
||||
| K en ya |
T R |
R d s P j t oa ro ec |
C- 1 0 4 |
6 7 |
7 .8 |
6 .4 |
2 .7 |
2 2 4 |
2 0 0 |
2 6 9 |
2 4 0 |
||
| K en ya |
T R |
d 2n H i gh wa y |
C- 1 2 0 |
6 8 |
1 6 .2 |
1 2 .9 |
0 .6 |
||||||
| K en ya |
T R |
d 3r H i gh wa y |
C- 6 3 9 |
6 9 |
3 6 .3 |
2 3 .5 |
1 6 .7 |
9 7 5 B |
1 4 5 0 B |
||||
| K en ya |
T R |
4t h H i gh wa y |
C- 2 7 6 |
7 1 |
4 2 .0 |
2 2 .0 |
1 6 .6 |
1 5 8 2 B |
1 5 2 5 B |
||||
| K en ya |
T R |
5t h H i gh wa y |
L- 9 3 2 |
7 3 |
2 3 9 .7 |
2 9 .0 |
2 .7 |
2 4 0 |
1 4 8 |
2 4 0 |
1 4 8 |
||
| K en ya |
T R |
R l A s R d ura cc es oa s |
L- 1 3 0 5 / C- 6 5 1 |
7 6 |
1 0 .1 |
8 .0 |
8 .0 |
1 0 0 0 |
1 5 9 0 |
||||
| K en ya |
A G |
S r R eh ab i l i t at i u ga on |
L- 1 6 3 6 |
7 8 |
1 3 2 .0 |
7 2 .0 |
7 .2 |
4 3 5 |
2 4 3 |
0 | 0 | ||
| K en ya |
A G |
N ok A D ar g. ev |
C- 8 5 8 |
7 8 |
1 8 .9 |
1 3 .0 |
1 .3 |
1 1 5 |
9 8 |
||||
| K en ya |
T R |
H i gh y S t wa ec or |
L- 1 6 8 4 |
7 9 |
1 1 0 .0 |
9 0 .0 |
6 .9 |
1 4 7 5 |
|||||
| L ot h es o |
T R |
R d oa |
C- 0 8 2 |
6 6 |
5 .4 |
5 .0 |
0 .6 |
3 0 |
|||||
| L i b i er a |
T R |
R d P j t oa ro ec |
L- 3 6 8 |
6 4 |
5 .9 |
3 .3 |
2 .8 |
1 2 0 B |
1 2 0 B |
||||
| L i b i er a |
T R |
d 2n H i gh wa y |
L- 9 0 7 |
7 3 |
1 4 .1 |
3 .0 |
1 .8 |
||||||
| L i b i er a |
T R |
d 3r H i gh wa y |
L- 1 1 5 6 |
7 5 |
4 6 .7 |
2 7 .5 |
1 .8 |
1 5 0 B |
1 3 0 B |
||||
| L i b i er a |
T R |
F d R d ee er oa s |
L- 1 6 6 4 |
9 7 |
1 8 .8 |
1 0 .7 |
1 0 .7 |
1 1 0 5 |
1 0 0 5 |
||||
| L i b i er a |
A G |
d 2n L of a A D g. ev |
C- 1 2 4 2 |
8 2 |
2 8 .0 |
1 5 .5 |
2 .2 |
2 3 4 B |
6 0 0 |
||||
| C nt ou r y |
D i vi si on |
P j t ro ec |
C red i L t oa n |
A p pr Y ea r |
T al ot A t mo un |
O ri gi l na P ri i l nc pa |
A t mo un f R l or ura R d oa s |
A p |
i l R d pra sa oa |
K ms |
A ct |
l R d ua oa |
K ms |
| L i b i er a |
A G |
d 2n B g A D on g. ev |
C- 1 4 4 7 |
8 4 |
2 2 .9 |
6 .7 |
3 .6 |
1 6 0 b |
4 4 0 |
||||
| M ad a ga sc ar |
T R |
h 6t H i gh wa y |
C- 1 3 9 1 / F 0 0 4 |
8 3 |
1 1 1 .0 |
4 .0 5 |
3 0 .1 |
9 0 0 |
2 0 0 0 |
||||
| M ad a ga sc ar |
G A |
C ot t D on ev |
C- 1 3 3 4 |
8 3 |
3 4 .4 |
.9 7 |
2 .8 |
2 7 5 |
| M al i aw |
A G |
L i l e A D P on gw |
C- 1 1 3 |
6 8 |
7 .2 |
7 .2 |
0 .6 |
2 6 9 |
1 0 2 7 |
|||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| M al i aw |
A G |
S h i V al l y A D re e g. ev |
C- 1 1 4 |
6 8 |
4 .6 |
4 .3 |
1 .1 |
2 6 5 |
4 9 |
2 6 5 |
4 0 |
|
| M al i aw |
A G |
d 2n L i l e A D P on gw |
C- 2 4 4 |
1 7 |
8 .6 |
.4 7 |
1 .7 |
8 6 0 |
9 6 0 |
|||
| M al i aw |
A G |
d 2n S h i V al l re e y |
C- 3 6 3 |
3 7 |
1 3 .5 |
1 0 .5 |
1 .9 |
1 8 0 |
3 2 .5 |
|||
| M al i aw |
T R |
d 2n H i gh wa y |
C- 2 3 5 |
7 4 |
1 2 .5 |
1 0 .0 |
2 .0 |
1 0 0 4 B |
1 0 9 5 B |
|||
| M al i aw |
G A |
d 3r L i l e A D P on gw |
C- 5 5 0 |
7 5 |
1 2 .0 |
8 .5 |
1 .7 |
4 2 4 |
6 0 0 |
|||
| M al i aw |
G A |
S C h i V al l y A re e g. on s. |
C- 8 2 3 |
7 8 |
1 2 .6 |
1 0 .7 |
1 .0 |
1 3 9 |
3 3 9 |
1 1 1 |
||
| M al i aw |
T R |
4t h H i gh wa y |
C- 1 0 9 9 |
8 1 |
4 2 .2 |
3 3 .0 |
7 .0 |
2 6 4 4 B |
2 7 7 6 B |
|||
| M al i aw |
T R |
5t h H i gh wa y |
/ C L- 2 3 6 3 1 4 2 3 / S F 6 |
8 3 |
8 4 .0 |
4 4 .9 |
1 0 .9 |
1 9 0 0 B |
1 1 9 9 B |
|||
| M al i aw |
T R |
I nf t t ras ruc ure |
8 9 |
1 5 7 .7 |
2 8 .8 |
5 .1 |
3 5 0 |
5 0 0 |
||||
| M al i |
T R |
H i gh y M ai nt wa en an ce |
C- 1 9 7 |
7 0 |
9 .3 |
8 .9 |
1 .2 |
1 4 5 0 |
||||
| M al i |
T R |
H i gh wa y |
C- 1 9 7 |
7 0 |
9 .3 |
8 .9 |
5 .9 |
1 4 5 0 |
4 7 0 |
|||
| M al i |
T R |
3rd H i gh wa y |
C- 5 9 9 |
7 5 |
1 3 .4 |
1 0 .0 |
3 .0 |
1 2 0 0 |
9 4 4 |
8 5 6 |
||
| M al i |
T R |
d 2n H i gh wa y |
C- 3 8 3 |
7 5 |
2 0 .5 |
9 .5 |
0 .9 |
|||||
| M ri i t au us |
A G |
R l D el t ura ev o pm en |
C- 4 1 9 |
3 7 |
1 1 .0 |
4 .0 |
2 .1 |
|||||
| N i ge r |
A G |
M ad i R .D ar |
C- 6 0 8 |
7 5 |
1 1 .9 |
1 0 .7 |
0 .8 |
8 0 |
||||
| N i ge r |
T R |
F d R d j t ee er oa s pro ec |
C- 8 8 6 |
9 7 |
1 3 .9 |
1 0 .0 |
1 0 .0 |
1 0 0 0 1 0 0 0 |
0 0 7 |
|||
| N i ge r |
T R |
T S rt t ra ns po ec or |
C- 1 0 6 7 |
8 6 |
2 1 2 .9 |
1 .0 5 |
1 1 .9 |
8 8 3 |
1 4 8 3 |
|||
| N i ri ge a |
T R |
N t h n R d or er oa |
C- 0 3 7 |
6 4 |
2 3 .7 |
1 8 .7 |
8 .5 |
1 3 5 |
0 7 5 |
|||
| N i ri ge a |
G A |
G us au |
L- 1 0 9 9 |
7 4 |
1 9 .0 |
3 .6 |
7 5 0 |
7 5 0 |
||||
| N i ri ge a |
G A |
G b om e |
L- 1 1 6 4 |
7 4 |
2 1 .0 |
3 .8 |
5 0 0 |
4 0 6 |
||||
| N i ri ge a |
G A |
d 2n C oc oa |
L- 1 0 4 5 |
7 4 |
4 0 .0 |
2 0 .0 |
4 .9 |
1 2 5 0 B |
3 8 0 B |
|||
| N i ri ge a |
A G |
F t un ua |
L- 1 0 9 2 |
7 4 |
2 9 .0 |
5 .0 |
7 5 0 |
5 2 1 |
||||
| N i ri ge a |
A G |
R i ce |
L- 1 1 0 3 |
7 4 |
3 5 .0 |
1 7 .5 |
3 .1 |
1 1 7 |
1 8 6 |
1 5 0 B |
||
| N i ri ge a |
A G |
L af i a A D g. ev |
L- 1 4 5 4 |
7 7 |
8 5 .0 |
2 7 .0 |
8 .4 |
6 0 0 |
7 9 6 B |
|||
| N i ri ge a |
A G |
A gb a A D ya n g. ev |
L- 1 4 5 5 |
7 7 |
8 5 .0 |
3 5 .0 |
8 .6 |
1 3 0 0 B |
1 6 6 7 B |
|||
| C nt ou r y |
D i vi si on |
P j t ro ec |
C red i t L oa n |
A p pr Y ea r |
T ot al A t mo un |
O ri gi l na P ri i l nc pa |
A t mo un f R l or ura R d oa s |
A p |
i l R d pra sa oa |
K ms |
A ct |
l R d K ua oa ms |
| N i ri ge a |
A G |
B i d a A D g. ev |
L- 1 6 6 7 |
7 9 |
4 1 .8 |
2 3 .0 |
2 .5 |
6 2 0 |
4 2 9 |
|||
| N i ri ge a |
A G |
I l i n A D or g. ev |
L- 1 6 6 8 |
7 9 |
6 4 .4 |
2 7 .0 |
4 .9 |
3 0 0 B |
7 2 B |
|||
| N i ri ge a |
A G |
O N t h A D ya o or g. ev |
L- 1 8 3 8 |
8 0 |
6 9 .4 |
2 8 .0 |
1 2 .0 |
5 5 0 |
2 5 0 |
8 0 0 |
3 6 2 B |
|
| N i ri ge a |
A G |
E k i t i- A k ok o A D g. ev |
L- 1 8 5 4 |
8 0 |
8 0 .5 |
3 2 .5 |
1 8 .4 |
2 5 0 |
2 5 0 |
5 0 0 |
2 5 7 B |
|
| N i ri ge a |
A G |
K o A D an g. ev |
L- 1 9 8 2 |
8 1 |
4 8 2 .2 |
1 4 2 .0 |
7 2 .0 |
1 4 4 0 |
9 4 0 B |
|||
| N i ri ge a |
A G |
B ch S t at e A D au g. ev |
L- 1 9 8 1 |
8 1 |
3 5 0 .6 |
1 3 2 .0 |
4 4 .0 |
1 2 0 0 |
1 2 8 0 B |
| 9 3 1 B |
|---|
| 4 0 3 2 2 5 |
| 0 0 0 T |
| 3 3 0 |
| 9 9 0 |
| 7 8 |
| 9 0 0 |
| 5 0 5 2 5 |
| 5 0 0 |
| 1 1 1 |
| 6 0 1 9 6 B |
| 1 6 6 B |
| 0 0 5 0 0 B |
| 0 0 0 5 9 5 |
| 6 0 3 0 0 B |
| 0 0 |
| 0 0 0 6 0 |
| A ct l R d K ms ua oa ms |
| 0 0 0 A |
| 5 0 2 4 3 |
| 8 0 0 9 0 0 |
| Z i mb ab we |
T R |
d 2n H i gh wa y |
L- 2 9 3 9 |
8 8 |
8 6 .4 |
3 2 .7 |
1 0 .9 |
1 7 7 2 |
|||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| S ub -T al ot |
4 3 6 .0 7 |
3 1 3 .8 7 |
1 0 3 8 .9 |
3 3 3 2 5 |
3 9 5 7 7 |
1 1 7 5 7 |
1 9 3 8 7 |
2 3 3 0 1 |
4 3 8 5 |
||||
| A PP RA ISA LS IN |
E P TH IPE LIN |
( J y 1 9 9 0 ) E an ua r |
|||||||||||
| C am er oo n |
T R |
R l I nf t t ura ras ruc ure |
8 9 |
1 7 8 .0 |
7 0 .0 |
7 0 .0 |
5 0 0 |
3 0 0 0 |
1 3 4 0 0 |
||||
| C on go |
T R |
R d R eh ab . & M ai nt oa |
8 9 |
6 9 .3 |
2 6 .0 |
0 .8 |
|||||||
| G ui ne a |
A G |
N i al R l I nf at on ura ras |
8 9 |
8 4 .4 |
3 6 .5 |
3 .5 |
2 4 2 5 |
2 0 0 0 |
|||||
| G ui ne a B i ss au |
T R |
I nf R eh ab t t ras ruc ure |
8 9 |
4 3 .3 |
2 3 .6 |
1 .6 |
1 0 7 |
1 4 4 |
|||||
| T ni an za a |
T R |
R d s S t P j t oa ec or ro ec |
8 9 |
8 5 7 .5 |
1 7 0 .3 |
2 0 .0 |
|||||||
| S ub -T al ot |
1 2 3 2 .5 |
3 2 6 .4 |
9 .9 5 |
0 0 5 |
9 5 5 5 |
1 4 4 5 5 |
|||||||
| T O T A L |
8 6 6 8 .5 |
3 5 0 0 .2 |
1 1 3 4 .9 |
3 5 8 3 2 |
5 9 3 7 4 |
9 0 7 1 5 |
1 7 9 3 7 |
2 3 3 0 0 |
4 5 3 8 |
AG - Agriculture
TR - Transportation
A – Annual Length
B – Constructed or Rehabilitated
G - Gravel
R - Regrading
T – Routine maintenance per year in each of the 7 states of the MSADP.
(Million of Current US\$)
| Nu | mb er oj Pr ect |
of s |
To tal ( |
Pr oj A ect US \$ i l l i m on |
t mo un ) |
Or ( |
i gi l Pr i na nc ( US \$ i l l i m on |
i l pa ) |
Am ou |
f Ru ral nt or |
R d oa s |
C st. on |
A rai sal R pp eh ab + R ( k i l om |
d L gh th oa en s ai M nt. rs) ete |
||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| rai A pp s Ye ar |
To t |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri c. |
| 64 | 2 | 2 | 0 | 1 31 .4 |
1 31 .4 |
0 .0 |
9 7.4 |
9 7.4 |
/ 0 0 |
50 .2 |
50 .2 |
0 .0 |
2 55 |
2 55 |
0 | 0 | 0 | 0 |
| 6 5 |
1 | 1 | 0 | 1 8 .6 |
1 8 .6 |
0 .0 |
1 6 .0 |
1 6 .0 |
0 .0 |
1 6 .0 |
1 6 .0 |
0 .0 |
1 ,3 0 0 |
1 ,3 0 0 |
0 | 1 ,3 0 0 |
1 ,3 0 0 |
0 |
| 6 6 |
1 | 1 | 1 0 |
2 3 .0 |
2 3 .0 |
0 .0 |
21 .1 |
21 .1 |
0 .0 |
2 .4 |
2 .4 |
0 .0 |
3 0 |
3 0 |
0 | 0 | 0 | 0 |
| 6 7 |
2 | 2 | 0 | 6 3 .2 |
6 3 .2 |
0 .0 |
51 .9 |
51 .9 |
0 .0 |
1 3 .5 |
1 3 .5 |
0 .0 |
2 55 |
2 55 |
0 | 3 50 |
3 50 |
0 |
| 6 8 |
4 | 2 | 2 | 21 5.7 |
1 6 5.6 |
50 .1 |
11 8 .3 |
6 9 .5 |
4 8 .8 |
1 0 .5 |
3 .2 |
7. 3 |
57 4 |
0 | 57 4 |
3 50 |
3 50 |
0 |
| 6 9 |
3 | 2 | 1 | 2 3 3 .9 |
21 3 .3 |
2 0 .6 |
14 8 .4 |
14 7.6 |
0 .8 |
9 7.8 |
82 .0 |
1 5.8 |
1 ,53 7 |
1 ,3 62 |
3 75 |
0 | 0 | 0 |
| 1 9 6 0- 6 9 |
1 3 |
1 0 |
3 | 6 8 5.7 |
61 5.0 |
70 .7 |
4 53 .1 |
4 0 3 .5 |
4 9 .6 |
1 9 0 .4 |
1 6 7.4 |
2 3 .0 |
4 ,1 51 |
3 ,2 02 |
94 9 |
2 ,0 0 0 |
2 ,0 0 0 |
0 |
| 70 | 4 | 3 | 1 | 1 3 6 .3 |
8 0 .3 |
56 .0 |
11 0 .9 |
76 .4 |
34 .5 |
3 5.8 |
3 0 .4 |
3 5. |
4 ,53 8 |
2 ,9 78 |
1 ,56 0 |
0 | 0 | 0 |
| 71 | 3 | 2 | 1 | 21 6 .9 |
21 6 .9 |
0 .0 |
12 9 .6 |
1 02 .9 |
2 6 .7 |
74 .0 |
6 7.9 |
6 .1 |
2 ,91 7 |
2 ,0 57 |
8 6 0 |
0 | 0 | 0 |
| 72 | 3 | 1 | 2 | 14 9 ,1 |
14 9 .1 |
0 .0 |
9 7.4 |
56 .3 |
41 .1 |
.3 55 |
4 7.7 |
6 7. |
1 ,44 0 |
4 3 0 |
1 ,01 0 |
0 | 0 | 0 |
| 73 | 6 | 3 | 3 | 1 0 3 7.4 |
92 7.5 |
1 0 9 .9 |
2 75 .6 |
22 8 .4 |
4 7.1 |
2 7.3 |
1 5.8 |
11 .4 |
1 ,3 6 8 |
3 8 8 |
9 8 0 |
0 | 0 | 0 |
| 74 | 12 | 2 | 1 0 |
4 58 .0 |
3 7.5 |
42 0 .5 |
41 6 .3 |
31 .7 |
3 84 .6 |
8 5.3 |
7. 7 |
77 .5 |
,73 1 7 |
2 ,2 0 0 |
,53 1 5 |
9 6 0 |
8 0 0 |
1 6 0 |
| 75 | 9 | 6 | 3 | 54 2 .3 |
3 81 .0 |
1 61 .3 |
32 6 .4 |
22 0 .5 |
1 0 5.9 |
1 3 6 .4 |
11 7.5 |
1 8 .9 |
4 ,3 71 |
2 ,94 7 |
1 ,42 4 |
1 0 ,24 4 |
1 0 ,24 4 |
0 |
| 76 | 5 | 3 | 2 | 14 7.7 |
6 6 .6 |
81 .1 |
1 04 .2 |
.3 55 |
4 8 .9 |
3 8 .8 |
32 .9 |
9 5. |
3 ,6 50 |
2 ,0 0 0 |
1 ,6 50 |
3 0 ,55 |
3 0 ,55 |
0 |
| 77 | 8 | 4 | 4 | 1 31 5.5 |
8 6 7.7 |
44 7.8 |
31 9 .9 |
1 3 8 .2 |
1 81 .7 |
12 6 .6 |
58 .1 |
6 8 .5 |
11 ,8 8 8 |
9 ,2 8 8 |
2 .6 0 0 |
6 ,12 5 |
5 ,42 5 |
70 0 |
| 78 | 8 | 3 | 5 | 9 ,2 57 |
58 .9 |
52 0 .3 |
31 7.7 |
4 6 .6 |
2 71 .1 |
3 0 .9 |
11 .2 |
1 9 .8 |
2 ,2 9 0 |
1 ,0 0 0 |
1 ,2 9 0 |
1 ,3 3 9 |
1 ,0 0 0 |
3 3 9 |
| 79 | 8 | 4 | 4 | 79 9 .2 |
54 2 .1 |
2 57 .2 |
3 0 9 .0 |
1 9 8 .6 |
11 0 .4 |
8 6 .6 |
54 .6 |
31 .9 |
5 ,6 55 |
3 ,62 5 |
2 ,0 3 0 |
4 ,76 0 |
4 ,3 0 0 |
4 6 0 |
| 1 9 70 -79 |
6 6 |
31 | 3 5 |
53 81 .7 |
3 32 7.6 |
2 0 54 .1 |
24 0 7.0 |
11 54 .9 |
12 52 .1 |
6 9 6 .9 |
44 3 .9 |
2 53 .0 |
4 5 ,84 8 |
2 6 ,91 3 |
1 8 ,9 3 5 |
2 6 ,9 78 |
2 5 ,31 9 |
1 ,6 59 |
| 8 0 |
6 | 1 | 5 | 3 92 .7 |
11 .6 |
3 81 .1 |
1 91 .5 |
9 .3 |
1 82 .2 |
70 .9 |
9 .3 |
61 .6 |
3 ,76 6 |
70 0 |
3 ,0 6 6 |
2 ,1 0 0 |
8 0 0 |
1 ,3 0 0 |
| 81 | 3 | 1 | 2 | 11 54 .8 |
55 .7 |
1 0 9 9 .1 |
4 0 5.2 |
4 3 .6 |
3 61 .6 |
1 62 .3 |
9 .2 |
1 53 .1 |
5 ,2 84 |
2 ,64 4 |
2 ,64 0 |
0 | 0 | 0 |
| 82 | 3 | 0 | 3 | 76 7.8 |
0 .0 |
76 7.8 |
24 9 .2 |
0 .0 |
24 9 .2 |
1 6 0 .6 |
0 .0 |
1 6 .6 |
2 ,3 84 |
0 | 2 3 84 ,0 |
2 ,70 0 |
0 | 2 ,70 0 |
| 8 3 |
8 | 4 | 4 | 72 0 .6 |
4 59 .9 |
2 6 0 .8 |
3 50 .4 |
2 55 .3 |
9 5.1 |
1 6 6 .1 |
1 34 .7 |
31 .4 |
9 ,2 6 0 |
6 ,78 5 |
2 ,4 75 |
4 ,3 0 0 |
2 ,0 0 0 |
2 ,3 0 0 |
| 84 | 5 | 2 | 3 | 4 6 9 .8 |
8 8 .4 |
3 81 .4 |
2 57 .3 |
4 6 .9 |
21 0 .4 |
14 0 .5 |
2 5.6 |
11 4 .9 |
2 ,9 0 0 |
84 0 |
2 ,0 6 0 |
7 ,34 0 |
6 ,9 0 0 |
44 0 |
| 8 5 |
4 | 2 | 2 | 58 4 .0 |
4 70 .4 |
11 3 .6 |
2 64 .0 |
21 9 .4 |
44 .6 |
3 6 .1 |
2 6 .9 |
9 .2 |
1 ,1 73 |
58 3 |
59 0 |
2 ,8 50 |
2 ,0 0 0 |
8 50 |
| 8 6 |
4 | 1 | 3 | 64 1 .3 |
2 50 .7 |
3 9 0 .6 |
24 3 .6 |
1 7.7 |
22 5.9 |
77 .5 |
14 .0 |
6 3 .5 |
2 ,3 3 3 3 |
8 8 3 |
1 ,4 50 |
3 ,4 8 3 |
1 ,4 8 3 |
2 ,0 0 0 |
| 8 7 |
1 | 1 | 0 | 2 3 .4 |
2 3 |
0 .0 |
1 9 .3 |
1 9 .3 |
0 .0 |
0 .9 |
0 .9 |
0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 8 8 |
6 | 1 | 5 | 62 9 .0 |
8 6 .4 |
54 2 .6 |
2 6 7.0 |
32 .7 |
2 34 .3 |
58 .5 |
1 0 .9 |
4 7.6 |
9 ,2 82 |
1 ,77 2 |
7 ,51 0 |
1 0 ,6 3 0 |
2 ,8 0 0 |
9 ,9 9 0 |
| 8 9 |
3 | 2 | 1 | 42 9 .0 |
2 6 8 .9 |
1 59 .4 |
1 6 0 .4 |
59 .1 |
1 01 .4 |
4 3 .9 |
1 6 .0 |
2 7.9 |
2 ,73 0 |
8 50 |
1 ,8 8 0 |
12 ,79 0 |
2 ,8 0 0 |
9 ,9 9 0 |
| 1 9 8 0- 8 9 |
4 3 |
1 5 |
2 8 |
58 12 .4 |
1 71 5.4 |
4 0 9 7.0 |
24 0 7.8 |
70 3 .2 |
1 70 4 .6 |
8 6 3 .3 |
24 7.5 |
61 5.8 |
3 9 ,11 2 |
1 5 ,0 57 |
24 ,0 55 |
4 6 ,1 9 3 |
1 5 ,9 8 3 |
3 0 ,21 0 |
| TO TA L |
12 2 |
56 | 6 6 |
11 8 79 .8 |
56 58 .1 |
62 21 .8 |
52 6 7.9 |
22 61 .6 |
3 0 0 6 .3 |
1 75 0 6 |
8 58 .8 |
8 91 .8 |
8 9 .11 1 |
4 5 ,1 72 |
4 9 ,9 3 9 |
75 ,1 71 |
4 3 ,3 02 |
31 ,8 6 9 |
(Million of Current US\$)
| Nu | mb er oj Pr ect |
of s |
To tal ( |
Pr oj A ect mo US \$ i l l i ) m on |
t un |
Or i ( |
gi l Pr i na nc US \$ i l l i m on |
i l pa ) |
Am nt ou |
f Ru ral or |
R d oa s |
C st. on |
A rai sal R pp eh ab + R ( k i l om |
d L gh th oa en rs) ete |
s ai M nt. |
|||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| rai A pp s Ye ar |
To t |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri |
To tal |
Tr | A gri c. |
| 64 | 2 | 2 | 0 | 2 9 .6 |
2 9 .6 |
0 .0 |
21 .9 |
21 .9 |
/ 0 0 |
11 .3 |
11 .3 |
0 .0 |
2 55 |
2 55 |
0 | 0 | 0 | 0 |
| 6 5 |
1 | 1 | 0 | 4 .2 |
4 .2 |
0 .0 |
3 .6 |
3 .8 |
0 .0 |
3 .6 |
3 .6 |
0 .0 |
1 ,3 0 0 |
1 ,3 0 0 |
0 | 1 ,3 0 0 |
1 ,3 0 0 |
0 |
| 6 6 |
1 | 1 | 1 0 |
5.4 | 5.4 | 0 .0 |
5. 0 |
5. 0 |
0 .0 |
0 .6 |
0 .6 |
0 .0 |
3 0 |
3 0 |
0 | 0 | 0 | 0 |
| 6 7 |
2 | 2 | 0 | 1 5.0 |
1 5.0 |
0 .0 |
12 .3 |
12 .3 |
0 .0 |
3 .2 |
3 .2 |
0 .0 |
2 55 |
2 55 |
0 | 3 50 |
3 50 |
0 |
| 6 8 |
4 | 2 | 2 | 50 .8 |
3 9 .0 |
11 .8 |
2 7.9 |
1 6 .4 |
11 .5 |
2 .5 |
0 .8 |
1 .7 |
57 4 |
0 | 57 4 |
3 50 |
3 50 |
0 |
| 6 9 |
3 | 2 | 1 | 57 .9 |
52 .9 |
5. 1 |
3 6 .7 |
3 6 .5 |
0 .2 |
24 .2 |
2 0 .3 |
3 .9 |
1 ,73 7 |
1 ,3 62 |
3 75 |
0 | 0 | 0 |
| 1 9 6 0- 6 9 |
1 3 |
1 0 |
3 | 1 62 .8 |
14 5.9 |
1 6 .9 |
1 0 7.4 |
9 5.7 |
11 .7 |
4 5.4 |
3 9 .7 |
5. 6 |
4 ,1 51 |
3 ,2 02 |
94 9 |
2 ,0 0 0 |
2 ,0 0 0 |
0 |
| 70 | 4 | 3 | 1 | 3 5.8 |
21 .1 |
14 .7 |
2 9 .1 |
2 0 .1 |
9 .1 |
9 .4 |
8 .0 |
1 .4 |
4 ,53 8 |
2 ,9 78 |
1 ,56 0 |
0 | 0 | 0 |
| 71 | 3 | 2 | 1 | 6 0 .1 |
6 0 .1 |
0 .0 |
3 5.9 |
2 8 .5 |
7.4 | 2 0 .5 |
1 8 .8 |
1 .7 |
2 ,91 7 |
2 ,0 57 |
8 6 0 |
0 | 0 | 0 |
| 72 | 3 | 1 | 2 | 4 5.0 |
4 5.0 |
0 .0 |
2 9 .4 |
1 7.0 |
12 .4 |
1 6 .7 |
14 .4 |
2 .3 |
1 ,44 0 |
4 3 0 |
1 ,01 0 |
0 | 0 | 0 |
| 73 | 6 | 3 | 3 | 3 6 3 .3 |
32 4 .8 |
3 8 .5 |
9 6 .5 |
8 0 .0 |
1 6 .5 |
9 .6 |
5. 6 |
4 .0 |
1 ,3 6 8 |
3 8 8 |
9 8 0 |
0 | 0 | 0 |
| 74 | 12 | 2 | 1 0 |
1 9 5.3 |
1 6 .0 |
1 79 .3 |
1 77 .5 |
1 3 .5 |
1 64 .0 |
3 6 .4 |
3 .3 |
3 3 .1 |
,73 1 7 |
2 ,2 0 0 |
,53 1 5 |
9 6 0 |
8 0 0 |
1 6 0 |
| 75 | 9 | 6 | 3 | 2 57 .0 |
1 8 0 .6 |
76 .4 |
1 54 .7 |
1 04 .5 |
50 .2 |
64 .7 |
55 .7 |
9 .0 |
4 ,3 71 |
2 ,94 7 |
1 ,42 4 |
1 0 ,24 4 |
1 0 ,24 4 |
0 |
| 76 | 5 | 3 | 2 | 71 .0 |
32 .0 |
3 9 .0 |
50 .1 |
2 6 .6 |
2 3 .5 |
1 8 .6 |
1 5.8 |
2 .8 |
3 ,6 50 |
2 ,0 0 0 |
1 ,6 50 |
3 0 ,55 |
3 0 ,55 |
0 |
| 77 | 8 | 4 | 4 | 6 9 5.0 |
4 58 .4 |
2 3 6 .6 |
1 6 9 .0 |
73 .0 |
9 6 .0 |
6 6 .9 |
3 0 .7 |
3 6 .2 |
11 ,8 8 8 |
9 ,2 8 8 |
2 .6 0 0 |
6 ,12 5 |
5 ,42 5 |
70 0 |
| 78 | 8 | 3 | 5 | 3 51 .9 |
3 5.8 |
31 6 .1 |
1 9 3 .0 |
2 8 .3 |
1 64 .7 |
1 8 .8 |
6 .8 |
12 .0 |
2 ,2 9 0 |
1 ,0 0 0 |
1 ,2 9 0 |
1 ,3 3 9 |
1 ,0 0 0 |
3 3 9 |
| 79 | 8 | 4 | 4 | 55 0 .1 |
3 73 .1 |
1 77 .0 |
21 2 .7 |
1 3 6 .7 |
76 .0 |
59 .6 |
3 7.6 |
22 .0 |
5 ,6 55 |
3 ,62 5 |
2 ,0 3 0 |
4 ,76 0 |
4 ,3 0 0 |
4 6 0 |
| 1 9 70 -79 |
6 6 |
31 | 3 5 |
2 62 4 .5 |
1 54 6 .9 |
1 0 77 .6 |
11 4 7.9 |
52 8 .2 |
61 9 .8 |
32 1 .1 |
1 9 6 .6 |
12 4 .4 |
4 5 ,84 8 |
2 6 ,91 3 |
1 8 ,9 3 5 |
2 6 ,9 78 |
2 5 ,31 9 |
1 ,6 59 |
| 8 0 |
6 | 1 | 5 | 2 9 6 .3 |
8 .7 |
2 8 7.6 |
14 4 .5 |
7. 0 |
1 3 7.5 |
53 .5 |
7. 0 |
4 6 .5 |
3 ,76 6 |
70 0 |
3 ,0 6 6 |
2 ,1 0 0 |
8 0 0 |
1 ,3 0 0 |
| 81 | 3 | 1 | 2 | 8 75 .0 |
42 .2 |
8 32 .8 |
3 0 7.0 |
3 3 .0 |
2 74 .0 |
12 3 .0 |
7. 0 |
11 6 .0 |
5 ,2 84 |
2 ,64 4 |
2 ,64 0 |
0 | 0 | 0 |
| 82 | 3 | 0 | 3 | 57 3 .1 |
0 .0 |
57 3 .1 |
1 8 6 .0 |
0 .0 |
1 8 6 .0 |
79 .6 |
0 .0 |
79 .6 |
2 ,3 84 |
0 | 2 3 84 ,0 |
2 ,70 0 |
0 | 2 ,70 0 |
| 8 3 |
8 | 4 | 4 | 52 5.9 |
3 3 5.6 |
1 9 0 .3 |
2 55 .7 |
1 8 6 .3 |
6 9 .4 |
21 2 .2 |
9 8 .3 |
22 .9 |
9 ,2 6 0 |
6 ,78 5 |
2 ,4 75 |
4 ,3 0 0 |
2 ,0 0 0 |
2 ,3 0 0 |
| 84 | 5 | 2 | 3 | 3 3 5.4 |
6 3 .1 |
2 72 .3 |
1 8 3 .7 |
3 3 .5 |
1 50 .2 |
1 0 0 .3 |
1 8 .3 |
82 .0 |
2 ,9 0 0 |
84 0 |
2 ,0 6 0 |
7 ,34 0 |
6 ,9 0 0 |
44 0 |
| 8 5 |
4 | 2 | 2 | 42 0 .5 |
3 3 8 .7 |
81 .8 |
1 9 0 .1 |
1 58 .0 |
32 .1 |
2 6 .0 |
1 9 .4 |
6 .6 |
1 ,1 73 |
58 3 |
59 0 |
2 ,8 50 |
2 ,0 0 0 |
8 50 |
| 8 6 |
4 | 1 | 3 | 54 4 .5 |
21 2 .9 |
3 31 .6 |
2 0 6 .8 |
1 5.0 |
1 91 .8 |
6 5.8 |
11 .9 |
53 .9 |
2 ,3 3 3 3 |
8 8 3 |
1 ,4 50 |
3 ,4 8 3 |
1 ,4 8 3 |
2 ,0 0 0 |
| 8 7 |
1 | 1 | 0 | 21 .8 |
21 .8 |
0 .0 |
1 8 .0 |
1 8 .0 |
0 .0 |
0 .8 |
0 .8 |
0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 8 8 |
6 | 1 | 5 | 62 9 .0 |
8 6 .4 |
54 2 .6 |
2 6 7.0 |
32 .7 |
2 34 .3 |
58 .5 |
1 0 .9 |
4 7.6 |
9 ,2 82 |
1 ,77 2 |
7 ,51 0 |
1 0 ,6 3 0 |
2 ,8 0 0 |
9 ,9 9 0 |
| 8 9 |
3 | 2 | 1 | 42 7.1 |
2 6 7.7 |
1 59 .4 |
1 59 .7 |
58 .8 |
1 0 0 .9 |
4 3 .7 |
1 5.9 |
2 7.8 |
2 ,73 0 |
8 50 |
1 ,8 8 0 |
12 ,79 0 |
2 ,8 0 0 |
9 ,9 9 0 |
| 1 9 8 0- 8 9 |
4 3 |
1 5 |
2 8 |
4 64 8 .7 |
1 3 77 .2 |
32 71 .5 |
1 91 8 .5 |
54 2 .3 |
1 3 76 .2 |
6 72 .4 |
1 8 9 .5 |
4 82 .9 |
3 9 ,11 2 |
1 5 ,0 57 |
24 ,0 55 |
4 6 ,1 9 3 |
1 5 ,9 8 3 |
3 0 ,21 0 |
| TO TA L |
12 2 |
56 | 6 6 |
74 3 6 .0 |
3 0 70 .0 |
4 3 6 6 .0 |
31 73 .8 |
11 6 6 .2 |
2 0 0 7.7 |
1 0 3 8 .8 |
42 5.9 |
61 3 .0 |
8 9 .11 1 |
4 5 ,1 72 |
4 9 ,9 3 9 |
75 ,1 71 |
4 3 ,3 02 |
31 ,8 6 9 |
ANNEX 3 – Table 1 IBRD/IDA Projects with Rural Road Components by Country (1964-1989) Constant Terms (1988m = 100)
| O ri gi ri i l P l na nc pa |
R al R d ur oa s |
A ai l R p pr sa |
d L gt h oa en |
|||
|---|---|---|---|---|---|---|
| C nt ou r y |
A T ot al nt m ou |
n/ C i L d t oa re |
R el at ed |
C st on |
R eh ab |
ai M nt |
| B i en n |
1 5 1 .0 |
7 7 .7 |
4 3 .7 |
8 4 0 |
2 ,4 5 5 |
3 ,5 2 5 |
| k i B F ur na as o |
.9 5 7 |
2 1 .5 |
1 .8 5 |
0 | 2 ,0 0 0 |
3 ,3 0 0 |
| C am ero on |
7 2 8 .1 |
2 9 3 .5 |
6 3 .1 |
3 ,9 5 0 |
4 ,6 0 6 A |
3 ,3 5 0 A |
| C h ad |
6 4 .2 |
5 0 .8 |
8 .8 |
1 0 2 |
8 0 0 |
3 ,1 0 0 R |
| C d ' i I ote vo re |
8 0 8 .6 |
4 0 1 .9 |
9 6 .6 |
4 6 G 7 |
4 4 6 ,7 |
,0 0 0 5 |
| C .A .R |
1 1 4 .1 |
2 8 .3 |
7 .8 |
0 | 1 ,5 5 0 |
2 ,3 0 0 |
| E th i pi o a |
1 1 1 3 .9 |
3 4 9 .9 |
1 9 9 .3 |
8 ,0 6 5 |
3 0 0 |
0 |
| G ab on |
1 1 0 .6 |
3 0 .2 |
1 0 .9 |
0 | 0 | 2 ,8 0 0 |
| G h an a |
2 9 3 .6 |
1 3 2 .6 |
3 0 .0 |
0 | 8 4 8 |
8 ,0 0 0 |
| ui G ne a |
3 5 .0 |
9 .2 |
3 .6 |
2 4 0 |
0 | 5 0 0 |
| K en ya |
1 5 3 2 .2 |
6 4 2 .0 |
2 0 5 .4 |
2 ,0 1 4 |
5 ,8 2 1 |
1 ,5 0 0 |
| L oth es o |
2 3 .0 |
2 1 .1 |
2 .4 |
0 | 3 0 |
0 |
| i b eri L a |
2 6 1 .2 |
1 2 6 .5 |
4 4 .7 |
1 ,1 0 5 |
6 6 4 B |
2 4 0 ,5 |
| ad M a ga sc ar |
1 9 9 .2 |
7 2 .5 |
4 5 .1 |
0 | 1 ,1 7 5 |
2 ,0 0 0 |
| M al i aw |
5 2 4 .5 |
2 9 8 .6 |
5 8 .1 |
2 ,4 8 7 |
6 ,4 8 4 |
3 3 9 |
| al i M |
1 4 2 .2 |
1 0 8 .5 |
3 .1 5 |
1 ,4 0 5 |
2 ,6 0 5 |
9 4 4 |
| ri ti M au us |
3 1 .4 |
1 1 .4 |
6 .0 |
0 | 0 | 0 |
| N i ge r |
2 9 4 .8 |
5 4 .8 |
3 0 .2 |
9 6 3 |
1 ,0 0 0 |
2 ,4 8 3 |
| N i ri ge a |
3 5 7 8 .6 |
1 0 7 .4 |
6 1 6 .6 |
8 ,6 5 7 |
8 ,8 3 1 |
1 6 ,6 2 0 |
| nd R wa a |
4 8 .4 |
2 9 .1 |
2 .1 |
0 | 1 ,3 0 5 B |
0 |
| l S en e ga |
2 2 2 .8 |
1 0 7 .7 |
3 9 .8 |
1 ,0 8 8 |
1 ,0 0 0 |
6 ,1 5 0 |
| S al i om a |
6 5 .4 |
1 7 .4 |
1 3 .4 |
2 1 0 |
6 0 0 |
0 |
| T ni an za a |
2 6 0 .6 |
1 2 7 .2 |
3 0 .1 |
2 ,0 6 0 |
7 9 3 |
3 5 0 |
| T o go |
2 9 .8 5 |
1 5 7 .5 |
4 8 .9 |
1 ,2 0 5 |
1 ,9 1 0 |
8 ,4 2 0 A |
| nd U ga a |
1 4 7 .7 |
1 0 6 .9 |
2 5 .3 |
2 4 |
2 ,3 9 4 |
1 5 0 |
| Z ai re |
3 3 6 .2 |
3 7 .8 |
1 4 .5 |
0 | 0 | 1 ,8 0 0 |
| Z b i am a |
4 3 .9 |
3 7 .0 |
1 .6 |
0 | 0 | 0 |
| i mb ab Z we |
1 8 3 .1 |
6 8 .9 |
4 7 .1 |
3 1 5 |
1 ,7 7 2 |
0 |
| T al ot |
1 1 6 6 8 .0 |
5 1 2 7 .7 |
1 7 4 6 .1 |
3 5 ,3 3 2 |
5 3 ,7 7 9 |
7 5 ,1 7 1 |
Notes :
A – Annual Length
B – Constructed or Rehabilitated
G – Gravel
R – Regrading
T – Routine maintenance per year in each
of 7 states of the MSADP
| Agricultural
Development
Project | Rehabilitation | | | Recurrent | | | Routine | | | | |
|----------------------------------------|----------------|----------------|------|-----------|-----------------|-------|---------|----------------|------|--|--|
| | Target | Actual
1987 | 1988 | Target | Actual
1987 | 1988 | Target | Actual
1987 | 1988 | | |
| Benue | 150 | - | - | 300 | - | - | 1,200 | 150 | 37 | | |
| Cross River | 150 | 160 | NA | 400 | 176 | NA | 1,000 | - | NA | | |
| Imo | 179 | 82 | 187 | 450 | 303 | 300 | 1,300 | 287 | 230 | | |
| Ogun | | | | | No road program | | | | | | |
| Plateau State | 350 | 57 | 129 | 840 | 96 | 1,025 | 180 | - | - | | |
| Anambra | 170 | 64 | 76 | 400 | - | 25 | 1,000 | - | - | | |
| Bendel | 150 | 32 | NA | 300 | 38 | NA | 1,000 | - | NA | | |
| Source: Supervision reports | | | | | | | | | | | |
Good examples on how to incorporate population densities have been provided by the ranking methodology in various projects including the Kenya RARP, MalaWs DRIMP, and Nigeria's ADPs. One of the main problems is how to weigh this factor against others such as producer surplus for example. Experience with local participation of district engineers (eg. Kenya!s RARP) showed that no mathematical formulation completely satisfies local level planners. Therefore, an agreement on a simple system of weights to evaluate the benefits and factors of each road in a given area is the first step to involve the local community. The other problem is how to find adequate micro level population data. Possible methods vary between countries, but the problem can generally be solved by developing densities from agricultural data, or in some cases during the topographic survey of the road. In some projects in Nigeria the densities have been derived from informal population counts obtained along the road.
The use of road target densities has been advocated in many countries. The main problem is the tendency to set target densities across country borders without proper evaluation of local conditions. However, there is enough regional (below national) level data from some countries in SSA to develop interregional comparison densities which can be more useful than national level densities.
The use of road target densities was tried in an early enclave ADP project in Nigeria. Project experience showed that the very high target rural road densities set at appraisal (similar to those in India) were inappropriate for Northern Nigeria. This points to the fact that comparisons of average rural road densities between countries (and even between SSA countries only) can be very misleading given the limitations of available data and the wide variations within countries. 1 Applying interregional rather than intercountry data, comparisons can be made among regions with similar resource endowments.
1 The lack of accurate records on road lengths is not unique to SSA. In most countries the rapidly changing state if rural roads and the existence of substantial numbers of unclassified kilometers outside of the executing Ministry's network limits the use of rural roads densities.
Data Collection for traffic has been very deficient. The SARs and PCRs for the ADPs in Nigeria show that traffic counts in the earlier projects were only done sporadically, and never in a way that allowed a systematic evaluation of changes in road use. For the more recent ADPs, the Federal Agricultural Coordinating Unit (FACU) has collected traffic data on some roads before and after improvements. However, comparisons of the same road have not been possible in most cases, because the surveys are conducted on roads which are later not included in the road programs, or have not been included in the road programs to date. For example, the road selection for Benue State (first MSADP) states that "traffic levels on roads rehabilitated are not known for most roads, despite the fact that a traffic count study was commissioned by FACU. However, the roads covered in the survey do not coincide with the areas of influence of the candidate roads in the first year plan in these states" (FACU, 1988)
Wide variations to traffic volumes often occurs among rural rods in one project and call for adoption of different road selection methods and design standards. For example, the roads included in the Niger State ADP (first MSADP), observed traffic which varied from 15 to 124 vehicles per day, which clearly denotes the need to estimate road user savings on the busier roads (e g above 50 vpd). A consultant report for the second MSADP, indicates even larger variations of traffic in the supposedly rural roads. In Niger state, five out of ten roads surveyed had daily traffic ranging from 174 to 658 vehicles per day, while in Kwara state two roads bad traffic of 350 and 970 vehicles per day. These large volumes of traffic are quite distinct from those expected in the PPAR for the first MSADP in which "site inquiries by the appraisal mission in agricultural areas generally indicated average daily traffic (ADT) of 30 to 35 vehicles on market days and normal of 15 to 20."
using densities to establish desired levels of service In addition, environmental problems (e.g. deforestation and erosion) are likely to arise from unreasonable extensions to the road networks and improper attention to landscape and drainage design.
7 Rural roads account for a small portion of total vehicular traffic (i.e about 90 percent of vehicle traffic move on 15 percent of main roads) but they are used for essential movements of persons and goods in agricultural areas. Traffic volume on rural roads is low, amounting to less than 10 vpd on many roads. Such low levels complicate forecasting due to high statistical errors and poor date availability. Examples of poor traffic forecasting are abundant. With such low volumes, only roads of low construction cost are justified to provide a transport facility, rather than the more expensive roads of higher standard which are usually advocated.